Tons per Hour (t/h) is an engineering term, also known as boiler capacity, boiler output, etc. It refers to the amount of steam generated per hour by a boiler at a certain pressure and temperature. Generally speaking, a 1tph boiler means that a boiler can produce one ton of steam per hour rather than the physical weight of the boiler is one ton.
Megawatt (MW) is a unit of thermal measurement. It is used to indicate the heat amount produced per hour by a hot water boiler at a certain pressure and temperature, commonly known as boiler output. The heat output of a 0.7MW hot water boiler per hour is equivalent to the heat of 1 ton of steam.
Boiler horsepower (Bhp) is a non-public braking force measurement unit used to measure the power of steam boilers during 19th to the 20th century. The general definition of a BHP means the energy required to produce 34.5 pounds (15.65 kg) of steam at the pressure of 0 psig (0 bar) and the pressure of 212°F (100°C) per hour.
Industrial boilers have many structural forms. The parameters differ according to different uses. So far, there has not been a unified rule. According to the different capacities, industrial boilers can be divided into three categories: small boilers, medium boilers and large boilers.
Capacity:1-20 t/h
Pressure:0.7-2 Mpa
Available fuel:
Nature gas, coke
oven
gas, biogas, methanol ...
Capacity:2-20 t/h
Pressure:1-2.5 Mpa
Available fuel:Biomass particles
Capacity:20-110 t/h
Pressure:1.25-5.3 Mpa
Available fuel:
Nature gas, coke
oven gas, blast furnace gas ...
Capacity:4-35 t/h
Pressure:1-2.5 Mpa
Available fuel:
Bituminous coal,
lean coal, anthracite
Capacity:20-110 t/h
Pressure:1.25-5.3 Mpa
Available fuel:
Nature gas, coke
oven gas, blast furnace gas ...
Capacity:10-100 t/h
Pressure:1.25-2.5 Mpa
Available fuel:
Bituminous coal,
anthracite, meagre coal ...
The capacity of industrial boilers should be determined according to the actual steam consumption or the area of heating supply.
First of all, you need to know the overall load range. Secondly, you need to find out the the peak conditions, including the duration of peak load, the frequency of peaks, that is, the periodicity of peaks. After having a thorough understanding the total load demand and peaks, you can consider the selection of the boiler capacity and boiler numbers. It is also necessary to consider the reserve amount while selecting boilers.
ZOZEN is always ready to provide cost-effective solutions that cater to customer needs, helping customers to improve operating efficiency and save costs.
Capacity:6 tph
Equipment:SZL6-1.25-M
Project boiler medium:Steam
Capacity:25tph
Equipment:SHX25-1.6-WII
Project boiler medium:Steam
Capacity:90 tph
Equipment:SZS90-1.6/300-Q
Project boiler medium:Steam
WhatsApp: +86 18861589035
WeChat: +86 13506150756
Live Chat+86188615890356
info@zozen.com
0086-510-68530299