zozen boiler
Home Service FAQs FAQ of biomass-fired boilers What is the Price of a 3 Ton Biomass Steam Boiler Delivered to Karachi Port (CNF)?

What is the Price of a 3 Ton Biomass Steam Boiler Delivered to Karachi Port (CNF)?

10 Apr 2026

When buyers in Pakistan request a CNF Karachi quote for a 3 ton biomass steam boiler, the price depends on several technical and logistical variables that need to be confirmed before any figure is issued.

What "3 ton biomass steam boiler" means in specification terms

A 3 t/h biomass steam boiler produces 3 tonnes of steam per hour. Based on ZOZEN's DZL series biomass steam boiler, the standard configuration for this capacity includes:

Capacity: 2–10 t/h (3 t/h falls within this range)
Working pressure: 1–2.5 MPa
Working temperature: 170–225°C
Applicable fuels: biomass pellets, rice husk, wood chips, palm shell, corn cob, straw, waste wood, etc.
Thermal efficiency: above 80%
What affects the CNF Karachi price

CNF (Cost and Freight) pricing to Karachi covers the boiler ex-works cost plus sea freight to Karachi port. The following factors directly affect the final figure:

Fuel type selected (pellets vs. loose biomass require different grate configurations)
Working pressure: 1 MPa, 1.6 MPa, or 2.5 MPa
Whether the order covers boiler body only, complete boiler system, or skid-mounted package
Auxiliary equipment included: feed water pump, economizer, dust collector, chimney
Port clearance and import documentation requirements for Pakistan
About ZOZEN DZL series for this application

The DZL series single-drum biomass steam boiler uses a chain grate stoker design. The combustion chamber and boiler body are integrated into a single horizontal structure, which reduces on-site installation complexity. The DZL series covers applications across heating, chemical, food processing, tobacco, textile, dyeing, feed, pharmaceutical, construction materials, brewing, rubber, and medical sectors.

ZOZEN holds CE, ASME, and DOSH certifications. For export to Pakistan, the relevant certification and documentation requirements should be confirmed during the quotation stage.

What to prepare before requesting a CNF quote

To receive an accurate CNF Karachi quotation, buyers are advised to provide: daily operating hours, fuel availability and moisture content, steam pressure and temperature requirements, site altitude, and whether a complete turnkey system or boiler-only supply is needed.

Related FAQs View More
Related news View More
  • From the Andes to São Paulo: How ZOZEN Boiler Is Expanding Its South American Industrial Footprint
    South America is rich in agricultural and energy resources and has a diverse manufacturing base. Industries such as papermaking, packaging and sugar processing are upgrading their production equipment as market and environmental requirements evolve. For these companies, a boiler is more than a steam source. Its performance affects production continuity, fuel consumption, process quality and emissions management. Through projects in Venezuela, Brazil and Ecuador, ZOZEN Boiler has continued to ex...
    21 Jul 2026
  • World Cup Spotlight on the Americas: How a Chinese Boiler Reached an Overseas Production Line
    As the 2026 FIFA World Cup brings the United States, Mexico and Canada into the international spotlight, attention is once again turning to the cities, industries and communities across North America. Away from the stadiums, manufacturing plants, beverage production lines and automotive component facilities continue their daily operations, providing steady support for local economies. ZOZEN Boiler’s WNS Series Serving Industrial Projects in North America In these less visible parts of ...
    14 Jul 2026
  • A Long-Run Story of an Old Boiler: ZOZEN WNS Series Gas-Fired Boiler Operating for 16 Years
    At the production site of a pharmaceutical company in Shanghai, a ZOZEN gas-fired steam boiler commissioned in 2010 has been operating steadily for 16 years. For this established pharmaceutical company, founded in 1995, the steam system is closely related to production rhythm, process coordination, and on-site operation support. Whether the equipment can maintain stable operation over the long term directly affects the continuity of daily production. Time is a practical test, and the continuous ...
    07 Jul 2026

Find the Right Boiler For You

Name *

Email *

WhatsApp/WeChat

Products

Power/Capacity