zozen boiler
Home Service FAQs Boiler basics Can the pressure boiler be set in the basement?

Can the pressure boiler be set in the basement?

06 Jan 2023

The design and construction of boiler room is also a very important point in the safe use of boiler. The gas supply, combustion, inspection and other items of the boiler should also comply with the boiler room design code. As many users have consulted the question whether pressure boilers can be installed in the basement, ZOZEN Boiler here will give you a professional answer.

 

Can the pressure-bearing boiler be set in the basement? It is necessary to refer to the relevant design codes of boiler room, mainly including the Code for Design of Boiler Room and the Code for Fire Protection Design of Buildings, which stipulate:

1. Boiler room should be an independent building.

2. residential buildings, should not be set up boiler room.

3. When the boiler room is connected with other buildings or set inside it, it is strictly forbidden to set it on the upper floor, the lower floor, the adjacent position of the crowded places and important departments, as well as on both sides of the main passages and evacuation ports, and it should be set on the first floor or basement floor near the external wall of the building.

Note: When the boiler room is difficult to be arranged as an independent building and needs to be connected with other buildings or set inside it, in order to ensure safety, it is specially stipulated that it should not be arranged on the upper floor, the lower floor, the adjacent position, the main passage and the two sides of the evacuation exit in crowded places and important departments (such as public bathrooms, classrooms, restaurants, auditorium of theaters, meeting rooms, waiting rooms, archives rooms, shops, banks and waiting rooms).

Note: The boiler room is located on the first floor and underground floor, which is beneficial to explosion venting, safety and fire control.

Note: It should be noted that the height of the boiler room itself exceeds the height of one floor, and when it is located in other buildings, it may occupy the height of two floors. As long as the boiler room itself is arranged as one floor and there is no floor in the middle, it will still be regarded as the first floor or the first floor, regardless of whether it has reached the second floor or the second floor of the building.

Note: When the boiler room has to be set inside other buildings, it should be set on the outer wall of the building. This is in consideration that if the boiler room has an accident, the harm can be reduced.

ZOZEN is a domestic A-class boiler manufacturer. Since its establishment for more than 30 years, it has rich project experience, completed many large-scale pressure boiler projects, and provided boiler solutions for many users at home and abroad.

Related FAQs View More
Related news View More
  • ZOZEN DZL Biomass Steam Boiler Serves Cambodia’s Food Processing Industry
    Cambodian rice processor AMRU Rice generates a large amount of rice husk during production and requires a stable steam supply for cleaning, steaming, drying, and other processing stages. Based on the company’s fuel availability and steam demand, ZOZEN Boiler supplied an ASME-compliant DZL series single-drum biomass boiler. The boiler converts rice processing by-products into thermal energy and provides continuous steam for the production line. ZOZEN DZL Biomass Steam Boiler Supports Ric...
    06 Oct 2026
  • ZOZEN Boiler Makes Its Presence Felt at the 23rd China-ASEAN Expo, Expanding Cooperation Opportunities in the ASEAN Market
    Recently, activities related to the China-ASEAN Expo have continued to attract attention. As an important economic and trade platform connecting China and ASEAN markets, the China-ASEAN Expo brings together enterprises, buyers, and industry organizations from different countries and regions. It provides manufacturing companies with opportunities to understand market demand, present product solutions, and conduct business exchanges. The 23rd China-ASEAN Expo Concludes Successfully During the ...
    29 Sep 2026
  • ZOZEN Boiler to Attend AHR Expo Mexico 2026 at Booth 1847
    From September 29 to October 1, 2026, AHR Expo Mexico 2026 will take place at Expo Guadalajara in Guadalajara, Mexico. ZOZEN Boiler will present its industrial boiler products and solutions developed for overseas projects at Booth 1847. During the exhibition, the ZOZEN Boiler team will introduce its oil- and gas-fired boilers, biomass-fired boilers, thermal oil heaters and related products to customers across Latin America. The team will also discuss fuel adaptability, thermal system configurati...
    22 Sep 2026

Find the Right Boiler For You

Name *

Email *

WhatsApp/WeChat

Products

Power/Capacity