What are the coking methods?

02 Dec 2022

Coking methods:

a) Open the ignition door, lay wood blocks of 1-1.5m range long area in front of grate (better use refractory wood blocks like tree knot, wood plate with nails prohibited), and use cotton or other combustible to ignite.

 

b) Flame should be in the middle of furnace, burning evenly and can not be intermittent. During boiling, fire should be gradually strengthened to avoid sudden heating. During wood coking period, open flue damper to adopt natural ventilation.

 

After coking more than 24 hours by wood, fuel appropriately biomass fuel for combustion and at this time shut down flue gas damper and FD fan damper, discontinuously turn on ID fan and FD fan for mechanical ventilation.

 

c) Temperature rise speed during coking should be according to flue gas temperature of furnace outlet, and its temperature rise speed is different according to different furnace wall structure: brick-concrete furnace wall, temperature rise can not exceed 80 °C every day and later gas temperature should not exceed 160 °C. Heat-resistant concrete wall, after normal curing period (alumina cement is about 3 days and nights, silicate and slag silicate is about 7 days and nights, then start coking. Coking temperature rise should not exceed 10 °C per hour, later the gas temperature should not exceed 160 °C, the highest temperature range duration should not be less than I day). If furnace wall is very wet, slow down temperature rise speed appropriately.

 

d) Coking time: light wall is generally appropriately for 3 ~ 6 days and heavy wall is generally appropriately for 10 ~ 15 days. Regularly inspect the furnace wall and control temperature properly to prevent defects such as cracks and bump.

 

e) Coking is qualified when up to one of the following standards: e-1) When using furnace wall ash sample method, take mortar (each about 50g) from T cross joint of refractory brick in the central of both sides of combustion chamber wall and in the central of both sides of furnace cavity outlet and its moisture content is lower than 2.5%.

 

e-2) When using thermometry, while temperature inside 100mm of brick wall surface in both sides of the combustion chamber is up to 50 °C, then maintain 48 hours, or joint temperature between two sides refractory bricks at furnace outlet external and thermal insulation layer is up to 100 °C, and then maintain 48 hours.

 

f) Pressure can not rise in boiler during coking. When pressure rises to an atmospheric pressure, exhaust steam by safety valve and fill water timely.

Related FAQs View More
Related news View More
  • Guarding the Flavor of the "Red Industry": ZOZEN Gas Steam Boiler Solves Pain Points in Tomato Processing
    Every August to September, Xinjiang welcomes a grand feast of red harvest. As a globally significant production base for tomato paste, tomato products here are renowned for their high lycopene content. However, for tomato processing enterprises, this is not just a harvest season, but a race against time. The tomato maturity period is concentrated, and fresh fruit is difficult to store, leaving a processing window of only 45 to 55 days. Once equipment downtime occurs, mountains of fresh fruit wil...
    17 Feb 2026
  • Another Success in Indonesia: ZOZEN Boiler Boosts Production and Efficiency for Palm Oil Mill
    On the edge of the tropical jungles of Sumatra, Indonesia, the hum of machinery blends with the scent of palm fruit, painting a busy picture of the local palm oil processing industry. As a key global production base, Indonesian oil processing enterprises have a high dependency on reliable thermal energy supply. Booming Oil Processing Industry in Indonesia Recently, Wuxi ZOZEN Boiler Co., Ltd. ("ZOZEN Boiler") successfully delivered and commissioned a 15 t/h SZL series coal-fired steam boiler...
    03 Feb 2026
  • ZOZEN Gas Hot Water Boilers: The High-Efficiency Core Powering Clean Heating Projects in Northern China
    As clean heating upgrades continue to accelerate across northern China, high-efficiency and environmentally compliant heating equipment has become essential to ensuring winter heating security while supporting the country’s carbon reduction goals. In Tianjin, several large district heating companies have independently selected the same core solution — the ZOZEN SZS series gas-fired hot water boiler — delivering stable heat throughout the winter while contributing to improved ai...
    27 Jan 2026

Find the Right Boiler For You

Name *

Email *

WhatsApp/WeChat

Products

Power/Capacity