Coking methods:
a) Open the ignition door, lay wood blocks of 1-1.5m range long area in front of grate (better use refractory wood blocks like tree knot, wood plate with nails prohibited), and use cotton or other combustible to ignite.
b) Flame should be in the middle of furnace, burning evenly and can not be intermittent. During boiling, fire should be gradually strengthened to avoid sudden heating. During wood coking period, open flue damper to adopt natural ventilation.
After coking more than 24 hours by wood, fuel appropriately biomass fuel for combustion and at this time shut down flue gas damper and FD fan damper, discontinuously turn on ID fan and FD fan for mechanical ventilation.
c) Temperature rise speed during coking should be according to flue gas temperature of furnace outlet, and its temperature rise speed is different according to different furnace wall structure: brick-concrete furnace wall, temperature rise can not exceed 80 °C every day and later gas temperature should not exceed 160 °C. Heat-resistant concrete wall, after normal curing period (alumina cement is about 3 days and nights, silicate and slag silicate is about 7 days and nights, then start coking. Coking temperature rise should not exceed 10 °C per hour, later the gas temperature should not exceed 160 °C, the highest temperature range duration should not be less than I day). If furnace wall is very wet, slow down temperature rise speed appropriately.
d) Coking time: light wall is generally appropriately for 3 ~ 6 days and heavy wall is generally appropriately for 10 ~ 15 days. Regularly inspect the furnace wall and control temperature properly to prevent defects such as cracks and bump.
e) Coking is qualified when up to one of the following standards: e-1) When using furnace wall ash sample method, take mortar (each about 50g) from T cross joint of refractory brick in the central of both sides of combustion chamber wall and in the central of both sides of furnace cavity outlet and its moisture content is lower than 2.5%.
e-2) When using thermometry, while temperature inside 100mm of brick wall surface in both sides of the combustion chamber is up to 50 °C, then maintain 48 hours, or joint temperature between two sides refractory bricks at furnace outlet external and thermal insulation layer is up to 100 °C, and then maintain 48 hours.
f) Pressure can not rise in boiler during coking. When pressure rises to an atmospheric pressure, exhaust steam by safety valve and fill water timely.
-
SZL series biomass-fired steam boilerLive Chat6-35 t/h1-2.5 MPa
-
DZL series biomass-fired steam boilerLive Chat2-10 t/h1-2.5 MPa
-
DHL series biomass-fired steam boilerLive Chat20-75 t/h1.25-5.4 MPa
-
Email us
-
WhatsApp: +86 18861589035
WeChat: +86 13506150756
Live Chat
-
Following the successful operation and intelligent upgrade of its Thailand factory, Sentury Tire has taken another strategic leap forward. The first batch of tires has officially rolled off the production line at its new Morocco factory, marking a significant milestone in the company's "Go Global 2.0" strategy. As a long-term partner of Sentury Tire, ZOZEN Boiler once again provided strong support with two sets of gas-fired steam boilers, helping the company take a solid step in its global produ...17 Dec 2024
-
Anyang, a city known as the "Yubei Textile City," boasts a long history in the textile industry and is an important base for knitting, weaving, and printing and dyeing in Henan Province. In the Beiguan District of Anyang City, the printing and dyeing demonstration park is injecting new vitality into the green development of the textile printing and dyeing industry with an innovative circular economy model that integrates six major functions. As a leader in the industrial boiler industry, ZOZEN&n...10 Dec 2024
-
Under the backdrop of global economic integration, an increasing number of companies are choosing to establish factories overseas. Thailand, as an important base for the global rubber industry, has become a destination for the overseas expansion of many enterprises. The General Rubber Thailand factory, which is the overseas production base of General Shares, was invested in and built in the first phase in 2019 and officially put into operation in January 2020, laying a solid foundation for the d...03 Dec 2024