All equipment (includes boiler proper, economizer, burner, valves, instrument, electric control cabinet, chimney, water treatment, soft water tank, energy-saving circulating pump, raw water pump, deaerator, etc.) is designed to be installed on one or two prepared concrete bases. Skid mounted boiler has all interconnecting piping completed and has passed the cold state test at the factory before delivery. After the boiler arrives at the site, it only needs to be connected to water, electricity and gas to operate.