ZOZEN Boiler did a good job in epidemic prevention and control, to ensure the production and delivery of each project were completed in an orderly manner according to the time node. During the delivery process of the coal boiler in Pakistan project, ZOZEN Boiler sets the disinfection and sterilization area outside the factory.