What are the precautions for the maintenance of special spray gun for pulverized coal boilers?
1) In order to ensure the quality of atomization, the oil and air pressure should be used under the specified working conditions. During operation, the steam must be provided first and then the oil. When stopping the operation, the oil circuit must be cut first, and the steam line must be closed after the purge is completed.
2) The output of the oil gun can be controlled by adjusting the oil supply pressure.
3) In the initial operating stage of the oil gun, check whether the atomization is normal. If any problem is found, it should be solved in time. After the normal operation, it should be checked and cleaned regularly.
4) After the oil gun is put into operation normally, pay attention to the carbon deposition conditions of the gun head, flame stabilizing cover or impeller and deal with it regularly, otherwise it will have an adverse effect on the flame shape and combustion stability.
5) When disassembling and cleaning the oil gun head and diverter plate, do not damage the surface of the oil gun head and diverter plate, so as not to affect the sealing effect. When re-installing, the precision machined surfaces must be cleaned; and the installation sequence and direction of oil gun parts should adhere to the schematic drawing of the oil gun for boiler ignition.
-
DZL series coal-fired steam boilerLive Chat2-10 t/h1-2.5 MPa
-
SZL series coal-fired steam boilerLive Chat6-35 t/h1-2.5 MPa
-
DHL series coal-fired steam boilerLive Chat20-75 t/h1.25-5.4 MPa
-
Email us
-
WhatsApp: +86 18861589035
WeChat: +86 13506150756
Live Chat

-
From spinning and weaving to dyeing, printing and heat setting, steam is required throughout multiple stages of textile production. As textile enterprises pay closer attention to energy costs, steam supply stability and emission requirements, boiler selection can no longer be based solely on rated evaporation capacity. Local fuel availability, production load, boiler room conditions and ongoing operation and maintenance also need to be considered. Recent textile projects served by ZOZEN Boiler ...10 Nov 2026 -
IntroductionIn Wuhan, Hubei Province, Hubei Hanjia New Materials Co., Ltd. and Wuhan Yiqingsheng Building Materials Co., Ltd. required thermal energy equipment for autoclave curing and continuous production-line heating, respectively. Based on the production processes, fuel conditions and site requirements of the two companies, ZOZEN Boiler supplied an 8 t/h DZL series biomass steam boiler and a 7.2-million-kcal YWW series biomass thermal oil boiler. The two projects use different heat-transfer ...03 Nov 2026 -
At Guizhou Haocaitou Food Co., Ltd. in Tongren, Guizhou Province, a ZOZEN WNS series gas-fired steam boiler has been operating for five years as part of the company’s steam supply system. The WNS10-1.25-Q boiler, with a rated capacity of 10 t/h, serves as an important heat source for food production. In recent feedback, the customer noted that matching the equipment configuration to production requirements, along with ease of daily operation and maintenance, were key considerations when se...27 Oct 2026











