ZOZEN Boiler has rencently accomplished several key projects in China. ZOZEN Boiler provided values for the enterprises and support for the customers with its professional technology and service.
At the beginning of the 14th Five-Year Plan air pollution prevention and control work, as a large-scale industrial boiler manufacture, Wuxi ZOZEN Boiler Co., Ltd. has received a great amount of orders. The workshop is inspired by the good performance, the frontline workers are working hard and strive to complete the order task with good quality and quantity.
In Sri Lanka, a set of ZOZEN 15 tph DZW series biomass-fired steam boiler was being installed and debugged. The user is a well-known local palm oil manufacturer, AEN PALM OIL PROCESSING (PVT) LTD. The boiler fuel is palm fiber. The boiler is a tri-drum boiler which has characteristics of no ash accumulation, high efficiency and good environmental protection performance. There is no need to stop the boiler for dust removal, which can make the boiler keep the normal operation for a long time. Meanwhile, considering the combustion characteristics of palm fiber, ZOZEN technicians also optimize the feeding hopper, furnace arch and air distribution device of the boiler to solve the coking problem caused by the fuel combustion.
ZOZEN SZL series biomass-fired boiler has the characteristics of sufficient output and high thermal efficiency. To ensure the sufficient combustion of fuel and save the fuel costs, ZOZEN analyzes the characteristics of different fuels, and optimizes the feeding hopper, width and length of grate, grate rotating speed, secondary air inlet place and direction. ZOZEN also adopts the design of separate air chambers and air dampers to ensure the complete combustion of different biomass fuels and improve the boiler thermal efficiency to above 88%.
SZL series vertical dual drums chain grate water tube steam and hot water boiler, adopts quick fitting and assembly structure. The 4-6t/h boiler is of quick fitting tube structure, exit shop after completely assembled, the boiler of 6-35t/h is composed of 2 main components. The upper assembled component is the boiler proper heat absorbing part, and the lower assembled component is of combustion equipment. The former part of the boiler proper is arranged a membrane wall, the upper part of it is connected to boiler cylinder, and its lower part is connected to collective chest, so as to form a combustion room and absorb the radiated heat from the furnace. Its rear part is arranged with dense convection tubes between upper and lower boiler cylinders. The high temperature smog after combustion shall stand for twice returning flushing transversely to the heat accepting surfaces, and shall be introduced to coal saver singly arranged, and flow into duster and exhausted from chimney in the end.