1. Hydraulic should be carried out at a defined pressure before the start of a boiler.2. Check if the pump inlets are open at the start of a boiler.3. Install an automatic ash removal system such as rotary valves in a boiler so as to prevent the accumulation of ash in a furnace or other equipment. The accumulation may result in the blockage or excessive heating of boiler parts resulting in its failure.4. Pump priming must be done at the start of the boiler.5. All loose and wrong connections must...
A typical system includes the heater, circulation pump, expansion tank, and the user's process. Depending on the temperature requirements and the system design control valves may also be utilized.
The bed temperature rises sharply.
Oxygen levels go down and sometimes drop to zero.
The electric current of primary air fan is less and wind pressure of air compartment is higher.
Negative pressure of furnace is increased while the electric current of induced draft fan is reduced.
The slag discharge is difficult or unsuccessful.
When appearing bed clinkering, the bed temperature and bed pressure will be uneven distributed and not at normal condition; the measuring point of part bed tempe...
Specific performance:Low level alarm of expansion tank.Answer:Cause of failure:The pipeline system (including heater) has not been replenished in time after oil leakage or degassing. Troubleshooting:Eliminate system defects and add oil.