zozen boiler
HomeBoiler tagsboiler manufacturers mumbai

“boiler manufacturers mumbai”- related

Tags list
  • Warehousing and transportation 2020-08-24
    WNS series gas-fired or oil-fired boiler as the popular type of ZOZEN boiler is highly efficient and eco-friendly. In the finished warehouse, WNS series gas-fired or oil-fired boilers and all kinds of auxiliary machine and parts waiting for shipment are arranged orderly. The standard products can be delivered from stock. Intelligent production mode makes the delivery speed of ZOZEN Boiler faster than that of other boiler providers.
  • The shipment of ZOZEN's 25tph SZL25-1.6-SCⅢ biomass-fired boiler for Hebei Yigao Bioenergy Co., Ltd. 2020-07-27
    ZOZEN Boiler cooperated with Hebei Yigao Bioenergy Co., Ltd. to improve the reasonable and efficient utilization of biomass energy such as corn straws and so on. According to Hebei Yigao Bioenergy’s requirement of using biomass straws as fuel, ZOZEN Boiler reasonably designed the furnace arch, furnace wall and furnace heating surface of SZL series biomass-fired steam boiler by cooperating with Shanghai Jiaotong University to ensure the combustion efficiency and rated evaporation capacity of boiler.
  • Four sets of 29MW SZS hot water boilers (for gas industry) 2020-04-17
    ZOZEN customized the gas-fired hot water boiler system, and recommended several sets of SZS series natural gas fired hot water boilers, which had the characteristics of sufficient output, high thermal efficiency and stable operation. This series of boilers is designed with longitudinal double drums and "D" type chamber structure.
  • ZOZEN 3 stes of SZS series gas-fired steam boilers shipped to Bolivia 2020-01-17
    Bolivia is the highest average altitude country in the world, local Bolivian companies have higher requirements for boilers than general boilers. As the altitude increases, the atmospheric pressure and the air density decrease accordingly, which adversely affects boiler combustion. In view of this situation, ZOZEN technical team makes adjustments from the combustion system and exhaust system of boiler, fully considering the influence of low air pressure on boiler body design and combustion. By appropriately increasing the volume of the furnace to extend the residence time of the fuel in the furnace, and the problems of slow fuel burning speed and long burning time are solved.
  • Team building in November of ZOZEN E-commence Dept. 2019-12-09
    As a distinguished manufacturer of domestic industrial boiler manufacturers, in order to fully mobilize the enthusiasm of employees and improve employees' sense of belonging and identification with the company, ZOZEN E-commence Dept. will hold various type of group building activities every month to enrich employee life.
  • ZOZEN WNS series gas-fired (oil-fired) boiler production workshop 2019-12-09
    The boiler body of WNS series boilers adopts wet-back structure. The combustion, water level, temperature and steam pressure of the boiler are automatically adjusted and protected, which can realize fully automatical operation to ensure safety and reliability. The large-diameter corrugated furnace of this boiler ensures sufficient combustion of natural gas. Combined with an advanced low NOx burner, it can easily achieve the requirement of NOx≤30mg/Nm3. In addition, the boiler is also equipped with energy-saving equipment at the end of the boiler flue, so that the boiler thermal efficiency can reach over 98%.
  • Shipment of 15tph SZL series biomass fired steam boiler 2019-11-13
    This brand new 15tph biomass fired steam boiler is about ready to make the trip to be put into service for feed processing.
  • SZL series coal-fired (biomass-fired) chain grate boiler 2019-11-04
    SZL series vertical dual drums chain grate water tube steam and hot water boiler, adopts quick fitting and assembly structure. The 4-6t/h boiler is of quick fitting tube structure, exit shop after completely assembled, the boiler of 6-35t/h is composed of 2 main components. The upper assembled component is the boiler proper heat absorbing part, and the lower assembled component is of combustion equipment. The former part of the boiler proper is arranged a membrane wall, the upper part of it is connected to boiler cylinder, and its lower part is connected to collective chest, so as to form a combustion room and absorb the radiated heat from the furnace. Its rear part is arranged with dense convection tubes between upper and lower boiler cylinders. The high temperature smog after combustion shall stand for twice returning flushing transversely to the heat accepting surfaces, and shall be introduced to coal saver singly arranged, and flow into duster and exhausted from chimney in the end.
1 2 3 4