The price of 6-ton gas-fired boiler is affected by many factors, such as manufacturer, performance, auxiliary equipment configuration and so on. Before technical communication, the boiler manufacturer can't give an accurate figure. ZOZEN Boiler will deeply understand every actual demand of customers, and tailor-made the suitable scheme design and boiler configuration of 6-ton gas boiler.
ZOZEN energy-saving oil-fired boiler burns liquid fuels such as diesel, heavy oil, light oil, methanol, etc. The boiler capacity covers from 1ton/hr to 110tons/hr, the thermal efficiency is over 98%, and it can realize full-automatic and safe operation. According to the actual needs of users, ZOZEN energy-saving oil-fired boiler can be equipped with various energy-saving devices such as economizer, condenser, air preheater, etc., which can effectively reduce the smoke exhaust loss and improve the energy utilization rate.
WNS series and SZS series gas-fired steam/hot water boilers are the best-selling products of ZOZEN Boiler, which have the advantages of high thermal efficiency over 98%, emission of nitrogen oxides below 30mg/nm, excellent energy saving and environmental protection performance, and are well received by domestic and foreign markets. The capacity range of ZOZEN gas-fired steam/hot water boiler is 1-110 t/h and 0.7-116 MW, which can meet various production and heating needs of enterprises.
ZOZEN SZL series biomass-fired boiler has the characteristics of sufficient output and high thermal efficiency. To ensure the sufficient combustion of fuel and save the fuel costs, ZOZEN analyzes the characteristics of different fuels, and optimizes the feeding hopper, width and length of grate, grate rotating speed, secondary air inlet place and direction. ZOZEN also adopts the design of separate air chambers and air dampers to ensure the complete combustion of different biomass fuels and improve the boiler thermal efficiency to above 88%.
SZL series vertical dual drums chain grate water tube steam and hot water boiler, adopts quick fitting and assembly structure. The 4-6t/h boiler is of quick fitting tube structure, exit shop after completely assembled, the boiler of 6-35t/h is composed of 2 main components. The upper assembled component is the boiler proper heat absorbing part, and the lower assembled component is of combustion equipment. The former part of the boiler proper is arranged a membrane wall, the upper part of it is connected to boiler cylinder, and its lower part is connected to collective chest, so as to form a combustion room and absorb the radiated heat from the furnace. Its rear part is arranged with dense convection tubes between upper and lower boiler cylinders. The high temperature smog after combustion shall stand for twice returning flushing transversely to the heat accepting surfaces, and shall be introduced to coal saver singly arranged, and flow into duster and exhausted from chimney in the end.