Recently, ZOZEN Boiler has organized the training about boiler manufacturing process. This training is given by ZOZEN Boiler's sales manager with the participation of new employees from e-commerce department. They listens carefully and sales manger answers questions for them. The training is relaxing and pleasant, which improves their teamwork ability, deepens their mutual understanding and establishes a friendly and happy working relationship between them.
CMU short for China Medical University, located in Shenyang, Liaoning, is a university jointly established by the National Health and Family Planning Commission, the Ministry of Education, and the Liaoning Provincial Government. The DHL series hot water boiler provided by ZOZEN is the second-generation corner tube hot water boiler. This return visit, ZOZEN carried out all-round maintenance for the boiler to ensure the safety and stability of its heating in this winter.
Veolia (Harbin) Thermal Power Co., Ltd. was established in 2003 and is a Sino-foreign joint venture controlled by Veolia Group. ZOZEN customized a complete boiler system including multiple sets of WNS series gas-fired hot water boilers. This series of gas-fired boilers adopts full corrugated furnace to increases the strength and elasticity of the furnace and enhances the disturbance of the flue gas, effectively improving the heat transfer effect. The threaded fire tubes can effectively absorb the flame energy, and the heat transfer coefficient is 1.2 times higher than that of the ordinary tube. At the same time, the finned tube condenser added at the end of the flue can increase the boiler thermal efficiency to over 98%
SZS series boiler is designed with longitudinal double drums and " D " type chamber structure. Furnace is placed on the right and convection tube bank is on the left, super heater is arranged at convection tube bank. The body is fixed on the basement by middle and both end flexible supports and make the boiler expand horizontally sideways. Around the furnace is membrane water cooling tube wall. Furnace and tube bank are totally separated by the membrane water tube cooling wall at the left side of the furnace. The back part of bundle is sparse shift structure, front part is aligned structure. Smoke from furnace outlet enters re-burning chamber, convection tube bank area and then from left front part enters spiral fine coil economizer and condenser, and finally is discharged to atmosphere through chimney.
The ZOZEN coal-fired hot water boiler helped the heating company to successfully complete the centralized heating task in winter with its excellent performance, reliable operation and friendly environment performance. The tailor-made boiler system of ZOZEN realized the high efficiency and energy saving of the heating system, and provideD sufficient heat source protection to ensure the warmth of the people in the area.