Case introduction

Beverage and food production involves juice extraction, blending, sterilization, filling, capping, equipment cleaning, and other processes. Sterilization and cleaning require a continuous steam supply. The coordination between the steam system and the production schedule affects the heat supply and day-to-day production management.

The customer is a beverage and food manufacturer in Taizhou equipped with automated juice extraction, filling, sterilization, and capping lines. Based on its production processes, available fuel, and project construction requirements, the company purchased a DZW series biomass steam boiler from ZOZEN Boiler. The equipment has been installed, and commissioning and related work will be carried out according to the project schedule.

The DZW series biomass steam boiler uses a reciprocating grate. The reciprocating motion of the grate moves the fuel toward the rear of the furnace, allowing it to pass through preheating, ignition, combustion, and burnout stages. This staged combustion process helps improve ventilation through the fuel bed and reduces the impact of localized fuel accumulation on combustion.

According to the fuel used in the project, ZOZEN Boiler can configure the grate speed, air distribution, and combustion system of the DZW series biomass steam boiler, providing the equipment basis for subsequent boiler operation.

Customer feedback—— A Food Manufacturing Company in Taizhou

The sales and technical teams of ZOZEN Boiler discussed the solution with us based on the process steam requirements of the beverage production line. They also explained the equipment layout, installation conditions, and subsequent commissioning arrangements. After the equipment arrived on site, the project personnel continued to follow up on the project schedule, providing coordination for on-site installation and subsequent commissioning.