What are the operating process and precation of drying for coal-fired boiler?
The flame drying method is suitable for coal-fired boiler. In order to avoid damaging the grate, we need to put a layer of cinder on the bottom of coal-fired boiler; then stack the firewood in boiler's combustion chamber and keep the flame in a central position after it is ignited for several days.
In the process pf drying, we should adjust the furnace pressure, flue gas temperature and drying time according to the actual requirements to ensure the drying quality. What's more, we should close the inlet doors in both sides of the boiler and add soft water to the boiler via water supply system.
Next, we should conduct sample analysis of the furnace water to confirm that the water quality reaches the standards, stop washing and close the drainage valves. Add water to the boiler slowly to control the water level to reach the standards. Before the drying, we also need to open the ash door and other doors properly to eliminate the moisture in the air timely.
After the wood drying is completed, we can conduct coal drying according to the requirements. At that time, we should increase the opening degree of forced draft fan, sightly open the induced draft fan and close the furnace door and ash door to further increase the gas temperature and realize the goal of drying the furnace wall.
In the whole drying process, we should pay attention to gradually increasing the temperature instead of burning by raging fire; regularly checking boiler's water level and keeping it within the normal range; keeping the flame balanced in the furnace.
In addition, we also should properly open the drainage valve and maintain the water level, regularly record the flue gas temperature to control the rise of temperature and high temperature and keep the temperature within the normal range. In general, under these conditions, boiler's drying quality can be ensured.
-
DZL series coal-fired steam boilerLive Chat2-10 t/h1-2.5 MPa
-
SZL series coal-fired steam boilerLive Chat6-35 t/h1-2.5 MPa
-
DHL series coal-fired steam boilerLive Chat20-75 t/h1.25-5.4 MPa
-
Email us
-
WhatsApp: +86 18861589035
WeChat: +86 13506150756
Live Chat
-
Following the successful operation and intelligent upgrade of its Thailand factory, Sentury Tire has taken another strategic leap forward. The first batch of tires has officially rolled off the production line at its new Morocco factory, marking a significant milestone in the company's "Go Global 2.0" strategy. As a long-term partner of Sentury Tire, ZOZEN Boiler once again provided strong support with two sets of gas-fired steam boilers, helping the company take a solid step in its global produ...17 Dec 2024
-
Anyang, a city known as the "Yubei Textile City," boasts a long history in the textile industry and is an important base for knitting, weaving, and printing and dyeing in Henan Province. In the Beiguan District of Anyang City, the printing and dyeing demonstration park is injecting new vitality into the green development of the textile printing and dyeing industry with an innovative circular economy model that integrates six major functions. As a leader in the industrial boiler industry, ZOZEN&n...10 Dec 2024
-
Under the backdrop of global economic integration, an increasing number of companies are choosing to establish factories overseas. Thailand, as an important base for the global rubber industry, has become a destination for the overseas expansion of many enterprises. The General Rubber Thailand factory, which is the overseas production base of General Shares, was invested in and built in the first phase in 2019 and officially put into operation in January 2020, laying a solid foundation for the d...03 Dec 2024