zozen boiler
Home Service FAQs FAQ of coal-fired boilers What are the operating process and precation of drying for coal-fired boiler?

What are the operating process and precation of drying for coal-fired boiler?

23 Feb 2024

The flame drying method is suitable for coal-fired boiler. In order to avoid damaging the grate, we need to put a layer of cinder on the bottom of coal-fired boiler; then stack the firewood in boiler's combustion chamber and keep the flame in a central position after it is ignited for several days.

In the process pf drying, we should adjust the furnace pressure, flue gas temperature and drying time according to the actual requirements to ensure the drying quality. What's more, we should close the inlet doors in both sides of the boiler and add soft water to the boiler via water supply system.

Next, we should conduct sample analysis of the furnace water to confirm that the water quality reaches the standards, stop washing and close the drainage valves. Add water to the boiler slowly to control the water level to reach the standards. Before the drying, we also need to open the ash door and other doors properly to eliminate the moisture in the air timely.

After the wood drying is completed, we can conduct coal drying according to the requirements. At that time, we should increase the opening degree of forced draft fan, sightly open the induced draft fan and close the furnace door and ash door to further increase the gas temperature and realize the goal of drying the furnace wall.

In the whole drying process, we should pay attention to gradually increasing the temperature instead of burning by raging fire; regularly checking boiler's water level and keeping it within the normal range; keeping the flame balanced in the furnace.

In addition, we also should properly open the drainage valve and maintain the water level, regularly record the flue gas temperature to control the rise of temperature and high temperature and keep the temperature within the normal range. In general, under these conditions, boiler's drying quality can be ensured.

Related FAQs View More
Related news View More
  • ZOZEN Boiler Makes Its Presence Felt at the 23rd China-ASEAN Expo, Expanding Cooperation Opportunities in the ASEAN Market
    Recently, activities related to the China-ASEAN Expo have continued to attract attention. As an important economic and trade platform connecting China and ASEAN markets, the China-ASEAN Expo brings together enterprises, buyers, and industry organizations from different countries and regions. It provides manufacturing companies with opportunities to understand market demand, present product solutions, and conduct business exchanges. The 23rd China-ASEAN Expo Concludes Successfully During the ...
    29 Sep 2026
  • ZOZEN Boiler to Attend AHR Expo Mexico 2026 at Booth 1847
    From September 29 to October 1, 2026, AHR Expo Mexico 2026 will take place at Expo Guadalajara in Guadalajara, Mexico. ZOZEN Boiler will present its industrial boiler products and solutions developed for overseas projects at Booth 1847. During the exhibition, the ZOZEN Boiler team will introduce its oil- and gas-fired boilers, biomass-fired boilers, thermal oil heaters and related products to customers across Latin America. The team will also discuss fuel adaptability, thermal system configurati...
    22 Sep 2026
  • ZOZEN Boiler Invites You to the 23rd China-ASEAN Expo
    From September 17 to 21, 2026, the 23rd China-ASEAN Expo will be held at the Nanning International Convention and Exhibition Center in Guangxi, China. Enterprises from China and the 11 ASEAN member states will gather in Nanning to present products and exchange views on trade and economic cooperation, artificial intelligence applications, smart equipment, green energy and other fields. With the theme “Share 3.0 Opportunities, Create a Better Life,” this year’s China-ASEAN Expo ...
    15 Sep 2026

Find the Right Boiler For You

Name *

Email *

WhatsApp/WeChat

Products

Power/Capacity