zozen boiler
Home Service FAQs FAQ of biomass-fired boilers What is the reason that the pump of a biomass-fired is not pumping water?

What is the reason that the pump of a biomass-fired is not pumping water?

28 Feb 2020
  1. If there is air in the pump or suction pipe, the air should be discharged.
  2. If the depth of the bottom valve immersed in the water is not deep enough, the depth should be increased.
  3. If the rotational speed is too slow or the conveyor belt is too loose, the rotational speed should be adjusted and the conveyor belt should be tightened.
  4. If the impeller, suction pipe and bottom valve are blocked by dirt, you should check the pump body and clean the dirt.
  5. If the height of water conveyance exceeds the regulations too much, the pump head should be adjusted to the specified range.
Related FAQs View More
Related news View More
  • ZOZEN Boiler in Shandong: Innovative Boiler Models Empower Diverse Production
    On the thriving industrial land of Shandong, the continuous demand for thermal energy supply from enterprises drives the transformation of the boiler industry. With profound technical expertise and ongoing innovation, ZOZEN Boiler remains at the forefront of providing high-quality, adaptable boiler models for various industries.   ZOZEN Boiler Provides Tailored Boiler Solutions for Shandong Industries   Looking back, the cooperation projects with Shandong Luhua Group and Shandong...
    29 Jul 2025
  • ZOZEN Gas Water Tube Boilers Make a Strong Entrance on Cable Industry
    In the industrial zone of Wen’an County, Xinghua Cable Co., Ltd. is making steady progress on its project with an annual production capacity of 11 million meters of wires, cables, and accessories, backed by an investment of RMB 520 million. Upon completion, the project is expected to create over 150 jobs and generate annual sales revenue of RMB 800 million, demonstrating promising prospects. As a key supplier of thermal energy equipment, ZOZEN Boiler is quietly supporting the development o...
    22 Jul 2025
  • ZOZEN Boiler Facilitates Power Plant “Oil-to-Gas” Upgrade
    On March 20, 2025, the Guizhou Jinyuan Zhijin “Replacing Small Units with Large Ones” Relocation Project (2×660 MW), under State Power Investment Corporation, successfully achieved the first ignition of its boiler. This project replaced traditional oil-fired ignition fuel with liquefied natural gas (LNG), setting a new precedent for employing clean energy in 660 MW ultra-supercritical “W” flame boilers. As a key equipment supplier for this project, ZOZEN Boiler prov...
    15 Jul 2025

Find the Right Boiler For You

Name *

Email *

WhatsApp/WeChat

Products

Power/Capacity