zozen boiler
HomeBoiler tags2000 kg/h of steam

“2000 kg/h of steam”- related

  • New Customized Type Gas-Fired Steam Boiler Delivery 2021-05-11
    The brand new customized gas-fired steam boiler of ZOZEN Boiler is now available, please click the chat online to learn more information.
  • The shipment of ZOZEN's 6tph packaged SZS series gas-fired steam boiler for Ji Xiang Ju 2020-07-21
    In response to increasingly serious environmental problems, Ji Xiang Ju Food decides to purchase low NOx and eco-friendly gas-fired steam boiler. To meet the new requirements, ZOZEN Boiler customizes the boiler system and recommends SZS series low NOx steam boiler to ensure the sufficient heat supply for Ji Xiang Ju Food's production line. This series of gas-fired boiler adopts D-model full membrane wall structure and combustion chamber adopts narrow-spacing tube membrane wall with good air impermeability to reduce heat loss and enhance the thermal efficiency to 98% and above with the economizer at the end of flue gas duct.
  • The shipment of ZOZEN SZS series of boiler 2020-06-10
    The shipment of ZOZEN SZS series of boiler. This series of steam boiler adopts a large furnace and an advanced burner to ensure the complete combustion of the fuel and improve fuel utilization. Besides, energy-saving devices are equipped at the end of the flue to improve the thermal efficiency of the boiler to more than 98%. In addition, with an intelligent control system, the boiler can realize automatic operation and automatic adjustment of steam temperature and pressure, which can realize energy saving and consumption reduction while ensuring the steam supply.
  • Shipment of ZOZEN 25tph SZS series low NOx steam boiler 2019-11-14
    SZS series boiler is designed with longitudinal double drums and " D " type chamber structure. Furnace is placed on the right and convection tube bank is on the left, super heater is arranged at convection tube bank. The body is fixed on the basement by middle and both end flexible supports and make the boiler expand horizontally sideways. Around the furnace is membrane water cooling tube wall. Furnace and tube bank are totally separated by the membrane water tube cooling wall at the left side of the furnace. The back part of bundle is sparse shift structure, front part is aligned structure. Smoke from furnace outlet enters re-burning chamber, convection tube bank area and then from left front part enters spiral fine coil economizer and condenser, and finally is discharged to atmosphere through chimney.