ZOZEN Boiler has designed a technical scheme for the project, including 3 sets of SZS series gas-fired superheated steam boilers and 1 set of WNS series gas-fired superheated steam boiler, of which two medium-temperature and medium-pressure SZS series gas-fired superheated steam boilers are used to cooperate with steam turbine for power generation.
ZOZEN Boiler adheres to the attitude of striving for perfection and improving in terms of manufacturing process. All staff have firmly kept in mind the importance of quality development and have implemented it into all the details of production.
In the modern production workshop, the fully automatic production line is a powerful guarantee for the efficient operation of ZOZEN Boiler; the orderly production site is the effective result of 6S management; and the cautious and conscientious work style and continuous innovation and search attitude of ZOZEN people is the backbone of the whole enterprise.
Continuing the 2020 industrial live streaming mode, ZOZEN Boiler has made the online visit normal. Recently, at the modern production base of Wuxi ZOZEN Boiler, technicians had connected with Finnish customers via the live streaming to show the whole process of the boiler hydrostatic test. Through the live streaming, ZOZEN not only showed the entire panorama of the hydrostatic test, but also showed the operating steps and pressure gauge values on the top of the boiler. The customers were very satisfied.
On the afternoon of January 4, 2021, ZOZEN annual and commendation conference was held at the production base located in Yixing, Jiangsu Province. More than 300 leaders and employees participated in the conference. ZOZEN general manager Zhang Guoping summarized the achievements of 2020, and put forward the new development direction and goals for 2021. Meanwhile, ZOZEN also awarded the advanced individuals and teams on the conference.
ZOZEN WNS series gas-fired and oil-fired boiler is equipped with the advanced condenser, which is a kind of flue gas waste heat exchanger whose working principle is the same as the economizer at the end of the coal-fired boiler. After a condenser is installed at the end of the boiler's flue gas duct, the high-temperature flue gas passes through the flue gas duct and the condenser at the same time, which can heat the water in the condenser, increase the feed water temperature and lower the exhaust gas temperature to achieve the goals of saving fuel and improving the thermal efficiency.
The processing accuracy and welding quality of the tube sheet directly affect the operation safety of the boiler. ZOZEN imported the CNC high-speed plane driller to greatly improve the pipe hole processing precision and the surface finish of the hole, creating favorable conditions for the subsequent expansion process.