zozen boiler
HomeBoiler tagscfbc boiler

“cfbc boiler”- related

  • Team building in November of ZOZEN E-commence Dept. 2019-12-09
    As a distinguished manufacturer of domestic industrial boiler manufacturers, in order to fully mobilize the enthusiasm of employees and improve employees' sense of belonging and identification with the company, ZOZEN E-commence Dept. will hold various type of group building activities every month to enrich employee life.
  • ZOZEN WNS series gas-fired (oil-fired) boiler production workshop 2019-12-09
    The boiler body of WNS series boilers adopts wet-back structure. The combustion, water level, temperature and steam pressure of the boiler are automatically adjusted and protected, which can realize fully automatical operation to ensure safety and reliability. The large-diameter corrugated furnace of this boiler ensures sufficient combustion of natural gas. Combined with an advanced low NOx burner, it can easily achieve the requirement of NOx≤30mg/Nm3. In addition, the boiler is also equipped with energy-saving equipment at the end of the boiler flue, so that the boiler thermal efficiency can reach over 98%.
  • Shipment of two sets of WNS series hot water boilers 2019-11-14
    These two brand new 0.7MW gas fired hot water boilers are about ready to make the trip to Mexico to support central heating in a hotel.
  • Shipment of 15tph SZL series biomass fired steam boiler 2019-11-13
    This brand new 15tph biomass fired steam boiler is about ready to make the trip to be put into service for feed processing.
  • SZL series coal-fired (biomass-fired) chain grate boiler 2019-11-04
    SZL series vertical dual drums chain grate water tube steam and hot water boiler, adopts quick fitting and assembly structure. The 4-6t/h boiler is of quick fitting tube structure, exit shop after completely assembled, the boiler of 6-35t/h is composed of 2 main components. The upper assembled component is the boiler proper heat absorbing part, and the lower assembled component is of combustion equipment. The former part of the boiler proper is arranged a membrane wall, the upper part of it is connected to boiler cylinder, and its lower part is connected to collective chest, so as to form a combustion room and absorb the radiated heat from the furnace. Its rear part is arranged with dense convection tubes between upper and lower boiler cylinders. The high temperature smog after combustion shall stand for twice returning flushing transversely to the heat accepting surfaces, and shall be introduced to coal saver singly arranged, and flow into duster and exhausted from chimney in the end.
  • SZS series gas fired (oil fired) water tube boiler 2019-11-04
    SZS series boiler is designed with longitudinal double drums and " D " type chamber structure. The furnace is on the right and convection tube bank is on the left. The body is fixed on the basement by middle and both end flexible supports and make the boiler expand horizontally sideways. Around the furnace is membrane wall. Furnace and tube bundle are totally separated by the membrane wall at the left side of the furnace. The back part of convection tube bank is sparse shift structure, front part is aligned structure. Smoke from furnace outlet enters re-burning chamber, convection tube bank area, and then from left front part enters spiral fin coil economizer and condenser, and finally is discharged to atmosphere through chimney.
  • WNS series gas-fired (oil-fired) firetube boiler 2019-11-04
    WNS series horizontal internal combustion boiler is a boiler shell type 3 passes wetback oil/gas fired boiler. After fuel is being atomized by burner, flame is full of the wave furnace and transfer heat via furnace wall, this is 1st pass; the high temperature smoke is collected in reversal chamber and then enters 2nd pass which is grooved tubes bundle area; after heat convection, air temperature gradually falls and goes to front smoke box and turn to 3rd pass, which is smooth tubes bundle area, and then enters chimney passing back smoke box and exhausted to the atmosphere.
  • ZOZEN service on site - pharmaceutical industry 2019-08-30
    ZOZEN engineer answered customer's questions during the use of the boiler; Measured the O2 content in exhaust gas with a flue gas analyzer.
1...5 6 7 8 9 10 11 12