ZOZEN gas-fired boiler body is equipped with steam-water separation and steam purification device. The steam has low water content and high quality, which is conducive to the full utilization of heat energy. Moreover, SZS series gas-fired boilers are equipped with advanced burners and intelligent control systems to ensure that economic operation can meet emission standards.
SZL series chain grate boiler can burn both the coal fuel and the biomass fuel. The boiler capacity is 4 tons to 35 tons. ZOZEN SZL series biomass-fired steam boiler has the advantages of compact structure, safe operation, high efficiency and sufficient output.
Boiler header is a kind of large-diameter pipe connecting several heating surface pipes. It is made of seamless steel pipes with welding heads at both ends, and there are many pipe holes on the header body for welding or expanding pipes. The boiler header collects or distributes the steam-water working medium, to reduce the transmission connecting pipes of working medium and the number of tappings in the drum, which can improve the safety of the drum.
ZOZEN ZZ series medium-temperature and medium-pressure gas-fired steam boiler adopts "D" type 2 passes. It is double-drum natural circulation water tube boiler. The flue gas turns at the back of the furnace, enters the convection tube bundle of the second pass, then leaves the boiler body, and enters the economizer and condenser in sequence.
SZS series boiler is designed with longitudinal double drums and " D " type chamber structure. Furnace is placed on the right and convection tube bank is on the left, super heater is arranged at convection tube bank. The body is fixed on the basement by middle and both end flexible supports and make the boiler expand horizontally sideways. Around the furnace is membrane water cooling tube wall. Furnace and tube bank are totally separated by the membrane water tube cooling wall at the left side of the furnace. The back part of bundle is sparse shift structure, front part is aligned structure. Smoke from furnace outlet enters re-burning chamber, convection tube bank area and then from left front part enters spiral fine coil economizer and condenser, and finally is discharged to atmosphere through chimney.
In the process of milk powder production, a large amount of steam is required in various process steps such as sterilization, concentration and drying. ZOZEN provided several sets of SZS series gas-fired steam boilers for this milk powder company. This series of gas-fired boilers adopts water-cooled full-membrane wall structure and conducts air-tightness test before heat preservation to ensure that the boiler has no cross-smoke phenomenon during micro-positive pressure combustion, which also hel...