In the production process, ZOZEN Boiler effectively manages personnel, machines, materials, methods and other production factors through 6S management method, and puts forward clear requirements for the daily behavior of every employee in the enterprise, starting from small things, so as to achieve the goal of improving production efficiency and quality.
The user undertakes the winter heating in the entire township. The gas-fired hot water boilers in this project are SZS series water tube boilers with reasonable structure design and safe and reliable operation.
ZOZEN provides a set of 15 tons superheated steam boiler for a paper making company in China. The boiler is the SZS series, it is designed with the superheater to raise the temperature to meet the demand.
ZOZEN 70MW hot water boiler are equipped with advanced systems and auxiliaries in the boiler room. For example, the automatic control system assists the user to control the boiler with simple operations.
ZOZEN prepares the 40-ton condensing superheated steam boiler for the delivery. It is designed with full membrane water cooling wall to maintain the thermal efficiency.
ZOZEN Boiler has undertaken the production of two 70MW gas-fired hot water boilers. At present, the ZOZEN gas-fired hot water boiler and system have been installed. The gas-fired hot water boiler is an integrated management of automatic operation, which can be monitored and controlled remotely.
The ASME boiler standard of the American Society of Mechanical Engineers is an internationally recognized authoritative boiler regulation and is widely used. Holding the ASME certificate is also a strong proof that an enterprise's management and technology have reached the international level. In 2007, ZOZEN took the lead in obtaining the ASME stamp and authorization certificate in the industry, taking a big step towards the international market. The biomass boiler is produced in strict accordance with ASME standards and meets the needs of users.
With a good reputation in the industry, ZOZEN Boiler has become the boiler supplier for the building materials project of a user. According to the heat consumption planning of the project, ZOZEN provides a heating system of 12-ton gas-fired boiler. When the boiler leaves the factory, it includes the boiler body, burner, energy-saving condenser, auxiliary equipment, etc. The 12-ton gas-fired boiler is convenient for transportation and installation.