zozen boiler
HomeBoiler tagscoal boiler sale

“coal boiler sale”- related

  • Four sets of 29MW SZS hot water boilers (for gas industry) 2020-04-17
    ZOZEN customized the gas-fired hot water boiler system, and recommended several sets of SZS series natural gas fired hot water boilers, which had the characteristics of sufficient output, high thermal efficiency and stable operation. This series of boilers is designed with longitudinal double drums and "D" type chamber structure.
  • ZOZEN 3 stes of SZS series gas-fired steam boilers shipped to Bolivia 2020-01-17
    Bolivia is the highest average altitude country in the world, local Bolivian companies have higher requirements for boilers than general boilers. As the altitude increases, the atmospheric pressure and the air density decrease accordingly, which adversely affects boiler combustion. In view of this situation, ZOZEN technical team makes adjustments from the combustion system and exhaust system of boiler, fully considering the influence of low air pressure on boiler body design and combustion. By appropriately increasing the volume of the furnace to extend the residence time of the fuel in the furnace, and the problems of slow fuel burning speed and long burning time are solved.
  • Customers from Sri Lankan came to visit ZOZEN 2020-01-17
    In recent years, with the continuous development of "the Belt and Road", China's manufacturing industry has gradually occupied the economic market of Sri Lanka. Sri Lanka Kaka's delegation had conducted a conprehensive investigation of industrial boiler manufacturers in China to choose a good supplier. Through the collection and analysis of the boiler market data in China, ZOZEN stood out with prominent quality in industrial boilers. After preliminary communication, the delegation was attracted by ZOZEN's professionalism and decided to conduct a fied inspection.
  • ZOZEN Boiler cooperates with Afghan Paper Industry Giant 2020-01-17
    On Christmas Eve 2019, General Manager Mr. Zhang Guoping signed an agreement with Shir Baz Kaminzada, CEO of Baheer group from Afghanistan on the papermaking steam boiler project and established a friendly and cooperative relationship. ZOZEN took another firm step towards the internationalization strategic goal! The heating and dissolving, machine shaping, black slurry concentration and squeeze drying of the chemicals in the pulping process all require heat sources, so the boiler is the main driving force for the production of the paper mill.
  • ZOZEN well-designed solid fuel fired chain grate stoker 2020-01-16
    The chain grate boiler is a grated fired boiler with a high degree of mechanization, the chain grate is the combustion equipment. The working principle is to drive the chain grate to rotate by the reducer, so that the solid fuel can be fired from the front to the end of the boiler, and the combustion efficiency is greatly improved compared with the fixed grate. When the chain is turned to the bottom, the air cooling lower the temperature, which can protect the grates from burning loss.
  • Team building in November of ZOZEN E-commence Dept. 2019-12-09
    As a distinguished manufacturer of domestic industrial boiler manufacturers, in order to fully mobilize the enthusiasm of employees and improve employees' sense of belonging and identification with the company, ZOZEN E-commence Dept. will hold various type of group building activities every month to enrich employee life.
  • Shipment of two sets of WNS series hot water boilers 2019-11-14
    These two brand new 0.7MW gas fired hot water boilers are about ready to make the trip to Mexico to support central heating in a hotel.
  • SZS series gas fired (oil fired) water tube boiler 2019-11-04
    SZS series boiler is designed with longitudinal double drums and " D " type chamber structure. The furnace is on the right and convection tube bank is on the left. The body is fixed on the basement by middle and both end flexible supports and make the boiler expand horizontally sideways. Around the furnace is membrane wall. Furnace and tube bundle are totally separated by the membrane wall at the left side of the furnace. The back part of convection tube bank is sparse shift structure, front part is aligned structure. Smoke from furnace outlet enters re-burning chamber, convection tube bank area, and then from left front part enters spiral fin coil economizer and condenser, and finally is discharged to atmosphere through chimney.