Specific performance:Low level alarm of expansion tank.Answer:Cause of failure:The pipeline system (including heater) has not been replenished in time after oil leakage or degassing. Troubleshooting:Eliminate system defects and add oil.
(Question details) Specific performance:The temperature difference between the inlet oil and the outlet oil temperature of the boiler exceeds the given value.Answer:Cause of failure:(1) The oil supply of the heat oil circulating pump is insufficient.(2) The boiler operates overload.(3) Thermal oil metamorphism.(4) The boiler does not match the heating equipment.(5) Bad insulation effect.(6) There is gas or steam in the thermal oil. Troubleshooting:(1) Remove the faults of oil pump and pipeline.(2) Operate at normal load.(3) Change new oil.(4) Choose proper boiler.(5) Check the insulation layer and repair the loopholes.(6) Remove air or steam. ZOZEN pays much attention to boiler furnace insulation also, the inside is made of high quality insulation material, external use of stainless steel plate, which can maximumly reduce heat loss and improve the operating environment.
(Question details) Specific performance:There is hammer sound in the oil inlet pipe, and the pointer of the inlet and outlet pressure gauge fluctuates.Answers: Cause of failure:The system contains gas and moisture.Troubleshooting:(1) Exhaust air.(2) Cook oil.
Question details (Performance):There is no feeding machine between hopper and # 0A/B belt, which causes unstable feeding and feeding amount cannot be controlled, during running, big amount material presses on belts which affect normal operation of the belt.Answer: The cause of the problem: Because the toughness of the biomass fuel is bigger, the proportion is small, material level should not be too high, otherwise it will occur block, so conveying system is normally running 24 hours, moving parts are easy to wear and cause high failure rate; also the length of the cut grass is difficult to guarantee its length between 8 ~ 15cm, and it is easy to get stuck in the feed machine before the furnace and it is difficult to clean, which has a great impact on the load of the boiler. Troubleshooting: 1. To reduce wearing and expand the service life of equipment, general motor adopts variable frequency motor, slow down the running speed, to control the rate of fuel feeding, make material's stacki
Question details (Performance):Dust collecting cloth bag damages a lot. Answer: The cause of the problem: As the biomass-fired boiler fuel moisture is high, and bag material is general PPS, which will reduce the base fabric of the bag in the case of high temperature, high humidity, hydrolysis, oxidation, and cause damage; In addition, the fuel moisture is high and it cannot be completely burned in the furnace, so it burns in the dust collector, which is also an important reason for the damage of the cloth bag.Troubleshooting:(1) Design by full consideration of high fuel moisture, choosing the appropriate induced draft fan, if the existing design is not enough then consider change the induced draft fan.(2) If induced air volume is sufficient, a proper distribution of the first and second wind should be considered. Generally, the fuel with high moisture and light quality such as wood chips, straw and wheat straw hood, the secondary air volume should be increased. For bark, miscellaneous
Question details (Specific performance):Biomass environmental protection and energy saving fuel made of straw and livestock etc., their combustion is not full. Answer: The cause of the problem:1. Air quantity is insufficient or too big.2. Outer flame position is not proper.Troubleshooting:1.Sufficient temperature: sufficient combustion of biomass boiler needs high temperature, combustion rate is proportional to the temperature, to raise the temperature as much as possible but guarantee there is no slagging.2. Proper air volume. If the air volume is too large, it will reduce the temperature of the furnace and increase the incomplete combustion of fuel. If the air volume is insufficient, the combustion efficiency will be reduced, and the waste of fuel will also increase the emission of smoke.3. Sufficient mixing of fuel and air. During the burning stage of biomass boilers, the sufficient mixing of air and fuel should be ensured and the disturbance should be strengthened during the burnin
(Question Details) Specific Performance:The pipe of superheater bursts in circulating fluidized bed boiler operation.The bed pressure indicator fluctuates little. Answer: causes of failure:(1) Design Factors.(2) Manufacturing process, installation and maintenance quality.(3) The temperature control device is unreasonable or does not work properly.(4) Effect of operating conditions on overheating and explosion of superheater. Troubleshooting:(1) Report the fact to operator on duty and require operating the boiler in low load.(2) When the overheat damage is serious,please report it to operator on duty and require stoping the boiler immediately to prevent blowout of the near pipes.(3) Adjust the steam temperature as much as possible within the normal range.(4) If the superheater tube is not damaged badly, it has little effect on the temperature level of the steam, and it can be allowed to run in a low load range for a short period of time.
(Question Details) Specific Performance:(1) The bed temperature has risen sharply.(2) The oxygen level drops even to zero.(3) The current of the primary blower is reduced, and the wind pressure in the wind chamber is high and fluctuates.(4) The furnace negative pressure increases and the induced draft fan current decreases.(5) Difficulties in slagging.(6) If coking in low temperature, the bed temperature, bed pressure distribution is uneven, the deviation is too large, the bed pressure, the plenum pressure, the bed temperature is not normal, and the local bed temperature measurement point is not normally raised or lowered.(7) The bed pressure indicator value fluctuates little. Answer: causes of failure :(1) Improper operation, resulting in overheated bed temperature and coking.(2) The primary air volume during operation is kept too small, which is lower than the minimum fluidized air volume, so that the material can’t be well fluidized but piled up, the temperature field of the entire