What about the high failure rate of fuel delivery system of biomass-fired boiler?
Question details (Performance):
There is no feeding machine between hopper and # 0A/B belt, which causes unstable feeding and feeding amount cannot be controlled, during running, big amount material presses on belts which affect normal operation of the belt.
Answer: The cause of the problem:
Because the toughness of the biomass fuel is bigger, the proportion is small, material level should not be too high, otherwise it will occur block, so conveying system is normally running 24 hours, moving parts are easy to wear and cause high failure rate; also the length of the cut grass is difficult to guarantee its length between 8 ~ 15cm, and it is easy to get stuck in the feed machine before the furnace and it is difficult to clean, which has a great impact on the load of the boiler.
Troubleshooting:
1. To reduce wearing and expand the service life of equipment, general motor adopts variable frequency motor, slow down the running speed, to control the rate of fuel feeding, make material's stacking height is always in a reasonable range, feeder can equally feed, minimize plugging.
2. According to the feed quantity and fuel type to choose feeding machine of corresponding size to solve the problem of plugging.
-
SZL series biomass-fired steam boilerLive Chat6-35 t/h1-2.5 MPa
-
DZL series biomass-fired steam boilerLive Chat2-10 t/h1-2.5 MPa
-
DHL series biomass-fired steam boilerLive Chat20-75 t/h1.25-5.4 MPa
-
Email us
-
WhatsApp: +86 18861589035
WeChat: +86 13506150756
Live Chat

-
Industrial heating upgrades can have a direct impact on a factory’s production schedule and operational stability. For manufacturers investing in new facilities or upgrading equipment in Vietnam, boiler selection involves more than fuel costs. Process temperatures, continuous heat supply, emission requirements, and long-term maintenance must all be taken into account. Whether transitioning from coal to natural gas or biomass, manufacturers need a heating solution tailored to their actual p...17 Nov 2026 -
From spinning and weaving to dyeing, printing and heat setting, steam is required throughout multiple stages of textile production. As textile enterprises pay closer attention to energy costs, steam supply stability and emission requirements, boiler selection can no longer be based solely on rated evaporation capacity. Local fuel availability, production load, boiler room conditions and ongoing operation and maintenance also need to be considered. Recent textile projects served by ZOZEN Boiler ...10 Nov 2026 -
IntroductionIn Wuhan, Hubei Province, Hubei Hanjia New Materials Co., Ltd. and Wuhan Yiqingsheng Building Materials Co., Ltd. required thermal energy equipment for autoclave curing and continuous production-line heating, respectively. Based on the production processes, fuel conditions and site requirements of the two companies, ZOZEN Boiler supplied an 8 t/h DZL series biomass steam boiler and a 7.2-million-kcal YWW series biomass thermal oil boiler. The two projects use different heat-transfer ...03 Nov 2026