The gas-fired replace coal-fired heating project is one of the decontamination projects to improve air quality in Tianjin. As a result, the fifth gas-fired replace coal-fired boilers project in Tianjin city center ware launched.
First, the coal-to-gas conversion project of the Tiantuo Heat Source Plant in Nankai District. The Tiantuo plant is surrounded by empty land to be built. The project plans to dismantle the original 3 sets of 58MW, 2 sets of 29MW coal-fired hot water boilers and 3 sets of 14 MW steam boilers. They build a new gas-fired boiler room on the west side of the existing boiler room, and install 10 sets of 29MW gas-fired boilers with auxiliary equipment, the heating area is maintained at 3.5 million square meters. Through vigorous bidding campaigns, ZOZEN provided 5 sets of 29MW gas-fired hot water boilers (SZS-1.6/130/70-Q) for the Tiantuo Heating Plant with advanced technology and strength in the boiler industry.
Second, Hedong District also undertakes the task of
Beijing Feitai Urban Construction Property Management Company mainly manages property management and boiler heating. The company manages 6 village communities and 2 heating plants. The total area of property management is 1.1 million square meters, and the heating area is 1.2 million square meters. At the end of 2016, Chengjian Property Development Co., Ltd. launched the procurement of boiler equipment for Jiao men and Wangyuan heating bid. ZOZEN boiler has a Class A boiler manufacturing license, a BRII pressure vessel manufacturing licese, and a comprehensive ISO9001:2000 international quality system certification, which makes it get the successful bid. In 2017, ZOZEN boiler provided 3 sets of 14MW SZS condensing gas-fired hot water boiler for the daily heating water for residential quarters for Jiaomen and Wangyuan heating plants.