This is the ZOZEN WNS series gas-fired hot water boiler, it has the advantages of high thermal efficiency, good performance of energy conservation and the automatic control system. This boiler is designed with the large combustion chamber, which can ensure the sufficient burning of the fuel, to improve the boiler thermal efficiency.
Welding is an important working procedure in boiler production, which is generally divided into automatic welding, semi-automatic welding and manual welding.
Boiler heating surface is the main heat transfer equipment of boiler, which can be divided into main heating surface and auxiliary heating surface. In order to enlarge the heating surface of the boiler, ZOZEN Boiler has independently designed and produced various energy-saving equipment, such as economizer, condenser, air preheater, which can match the actual working conditions of different users.
As a professional industrial boiler manufacturer, ZOZEN Boiler has advanced production technology and equipment, in which intelligent robot completes automatic welding under the tracking of photoelectric system, which makes the support welding of boiler more high quality and efficient. According to the drawings, the workers put the pre-welded steel in place, and the welding robot can automatically position and weld from eight directions, which not only improves the efficiency, but also effectively ensures the welding quality. The welder can complete the operation in front of the visual screen, avoiding the harm of smoke pollution and strong light to the eyes.
Boiler economizer is an energy-saving device installed at the tail of boiler flue. Its working principle is to heat boiler feed water into saturated water under drum pressure by absorbing waste heat in flue gas. As the economizer absorbs the heat of high temperature flue gas, it further reduces the exhaust temperature of flue gas, thus reducing the exhaust loss, improving the thermal efficiency of the boiler and effectively reducing the fuel consumption of the boiler. It is one of the important equipment of boiler system.
In the digital production base of ZOZEN Boiler with an area of 150,000 square meters, front-line workers conscientiously stick to their posts to ensure product quality.