The packaged boiler is so called because it comes as a complete package with burner, level controls, feedpump and all necessary boiler fittings and mountings. Once delivered to site it requires only the steam, water, and blowdown pipework, fuel supply and electrical connections to be made for it to become operational.
1) The entire plant may be purchased as a complete package, only needing securing to basic foundations, and connecting to water, electricity, fuel and steam systems before commissioning. This means that installation costs are minimised.
2) This package arrangement also means that it is simple to relocate a packaged shell boiler.
3) A shell boiler contains a substantial amount of water at saturation temperature, and hence has a substantial amount of stored energy which can be called upon to cope with short term, rapidly applied loads.
*This can also be a disadvantage in that when the energy in the stored water is used, it may take some time before the reserve is built up again.
4)The construction of a shell boiler is generally straight forward, which means that maintenance is simple.
5)Shell boilers often have one furnace tube and burner. This means that control systems are fairly simple.
Although shell boilers may be designed and built to operate up to 27 bar, the majority operat
Textile is one of the industries that cannot be separated from steam boilers. Whether it is dyeing or drying, boilers can speed up production smoothly. The oil-fired steam boiler is very suitable for textile mills. The oil-fired steam boilers produced by ZOZEN for textile mills mainly include SZS oil-fired steam boilers and WNS oil-fired steam boilers.
Pickling is the main method for removing a large amount of oxidizing substances and corrosion products inside a gas boiler, and also has the effect of eliminating scale. The pickling process is usually carried out after 1-3 weeks of boiler operation.
For an industrial boiler with reasonable structural design, its thermal efficiency is relatively high, and its exhaust gas discharge temperature is relatively low, so we must carefully consider the boiler property report form when purchasing the boiler.
If the impurities in the boiler feedwater are not dealt with properly, carryover of boiler water into the steam system can occur. This may lead to problems elsewhere in the steam system, such as:
If the hot oil pump of the fully automatic thermal oil heater is suddenly damaged and stops working during the operation, the boiler circulation will be blocked. If the fuel is still burning to make the oil temperature keep rising, it will cause the coking of the hot medium oil which is easy to cause a fire. If the fully automatic thermal oil heater catches fire due to the power cut during the operation, the boiler operator should quickly put out the fire in the furnace to stop the fuel from burning, and blow a large amount of cold air into the furnace to lower the temperature.