This series of double-drum steam boilers adopts a full membrane wall structure with good sealing performance. It is designed with large furnace to ensure full combustion of fuel and the thermal efficiency is over 98%. Meanwhile, this series of gas-fired steam boilers has reliable water circulation. Besides, the arrangement of various safety devices such as explosion-proof doors and flame detectors make the boiler operation safer and more reliable.
ZOZEN YLW series thermal oil heater adopts the chain grate as the combustion equipment. It can provide high-temperature heat source at various temperatures below 350℃, achiving low-pressure and high-temperature heating for the processes of dyeing, drying, slashing, printing and dyeing, etc. In addition, this series of thermal oil heater realize precise temperature control through an advanced oil temperature and oil pressure control system that greatly improves heat utilization, which meets the actual needs of textile companies.
As a distinguished manufacturer of domestic industrial boiler manufacturers, in order to fully mobilize the enthusiasm of employees and improve employees' sense of belonging and identification with the company, ZOZEN E-commence Dept. will hold various type of group building activities every month to enrich employee life.
SZS series boiler is designed with longitudinal double drums and " D " type chamber structure. The furnace is on the right and convection tube bank is on the left. The body is fixed on the basement by middle and both end flexible supports and make the boiler expand horizontally sideways. Around the furnace is membrane wall. Furnace and tube bundle are totally separated by the membrane wall at the left side of the furnace. The back part of convection tube bank is sparse shift structure, front part is aligned structure. Smoke from furnace outlet enters re-burning chamber, convection tube bank area, and then from left front part enters spiral fin coil economizer and condenser, and finally is discharged to atmosphere through chimney.
WNS series horizontal internal combustion boiler is a boiler shell type 3 passes wetback oil/gas fired boiler. After fuel is being atomized by burner, flame is full of the wave furnace and transfer heat via furnace wall, this is 1st pass; the high temperature smoke is collected in reversal chamber and then enters 2nd pass which is grooved tubes bundle area; after heat convection, air temperature gradually falls and goes to front smoke box and turn to 3rd pass, which is smooth tubes bundle area, and then enters chimney passing back smoke box and exhausted to the atmosphere.