All equipment (includes boiler proper, economizer, burner, valves, instrument, electric control cabinet, chimney, water treatment, soft water tank, energy-saving circulating pump, raw water pump, deaerator, etc.) is designed to be installed on one or two prepared concrete bases. Skid mounted boiler has all interconnecting piping completed and has passed the cold state test at the factory before delivery. After the boiler arrives at the site, it only needs to be connected to water, electricity and gas to operate.
This series of double-drum steam boilers adopts a full membrane wall structure with good sealing performance. It is designed with large furnace to ensure full combustion of fuel and the thermal efficiency is over 98%. Meanwhile, this series of gas-fired steam boilers has reliable water circulation. Besides, the arrangement of various safety devices such as explosion-proof doors and flame detectors make the boiler operation safer and more reliable.
The boiler body of WNS series boilers adopts wet-back structure. The combustion, water level, temperature and steam pressure of the boiler are automatically adjusted and protected, which can realize fully automatical operation to ensure safety and reliability. The large-diameter corrugated furnace of this boiler ensures sufficient combustion of natural gas. Combined with an advanced low NOx burner, it can easily achieve the requirement of NOx≤30mg/Nm3. In addition, the boiler is also equipped with energy-saving equipment at the end of the boiler flue, so that the boiler thermal efficiency can reach over 98%.
SZL series vertical dual drums chain grate water tube steam and hot water boiler, adopts quick fitting and assembly structure. The 4-6t/h boiler is of quick fitting tube structure, exit shop after completely assembled, the boiler of 6-35t/h is composed of 2 main components. The upper assembled component is the boiler proper heat absorbing part, and the lower assembled component is of combustion equipment. The former part of the boiler proper is arranged a membrane wall, the upper part of it is connected to boiler cylinder, and its lower part is connected to collective chest, so as to form a combustion room and absorb the radiated heat from the furnace. Its rear part is arranged with dense convection tubes between upper and lower boiler cylinders. The high temperature smog after combustion shall stand for twice returning flushing transversely to the heat accepting surfaces, and shall be introduced to coal saver singly arranged, and flow into duster and exhausted from chimney in the end.
SZS series boiler is designed with longitudinal double drums and " D " type chamber structure. The furnace is on the right and convection tube bank is on the left. The body is fixed on the basement by middle and both end flexible supports and make the boiler expand horizontally sideways. Around the furnace is membrane wall. Furnace and tube bundle are totally separated by the membrane wall at the left side of the furnace. The back part of convection tube bank is sparse shift structure, front part is aligned structure. Smoke from furnace outlet enters re-burning chamber, convection tube bank area, and then from left front part enters spiral fin coil economizer and condenser, and finally is discharged to atmosphere through chimney.
In recent years, Jinxi Petrochemical has accelerated its pace of development and is in urgent need of introducing a high-efficient and energy-saving boiler system. Regarding the actual production needs of Jinxi Petrochemical, ZOZEN recommended the safe and efficient SHL series field assembled water tube steam boiler and tailored the boiler system technical solution. This series of boilers has wide coal adaptability, the boiler water circulation adopts all-natural circulation, and each heating surface has relatively independent down comers to supply water, ensuring the safety of the overall water circulation. The large furnace design can extend the residence time of the flue gas in the furnace to make the full combustion of the fly ash and combustible gas. In addition, the flag pattern heating surface absorbs the temperature of the flue gas to a large extent, which improves the thermal efficiency of the boiler.
The body and the middle partition wall of ZOZEN DHL series corner tube hot water boiler adopt membrane water wall complete sealing structure, which greatly reduces the boiler heat loss and improves the boiler thermal efficiency. Meanwhile, the flag heating surface of this series of boilers is designed with patented technology of the same smoke velocity in variable cross-section, so that the flow velocity of the smoke in heated surface between the high temperature zone and the low temperature zone is uniform, reducing the ash accumulation and increasing the heat transfer co-efficiency. In addition, the water circulation structure of DHL series coal-fired boilers is identified the first domestic product in China due to its reliability and advancement. It is widely used because its comprehensive performance has exceeded similar products on the market.