50 Tons Gas-fired Superheated Steam Boiler for Energy Industry

Gas-fired boilers cases
  • Type

    Steam

  • Capacity

    50 tph

  • Location

    Danzhou, Hainan Province

  • Model

    ZZ50-4.2/485-Q

50 Tons Gas-fired Superheated Steam Boiler for Energy Industry
Case introduction

The customer project is located in Hainan Province with a total investment of 28 million US dollars in the first phase. After the project is completed, the biomass resources of Yangpu and surrounding cities and counties will be fully used to realize the resource utilization of renewable energy, and the heating steam will be provided for the enterprises in and around the development zone to meet the production needs of relevant enterprises. As the gas-fired boiler supplier of this project, ZOZEN boiler provided a set of gas-fired superheated steam condensing boiler with capacity of 50 tph.

 

ZOZEN ZZ Series gas-fired superheated steam boiler has the advantages of wide fuel adaptability and high thermal efficiency. In combination with the actual steam demand of the customer, the technicians of ZOZEN Boiler carried out scientific and reasonable design of the boiler system, which matched the operating process conditions of the user's production line. This series of boilers is delivered with field assembly. The installation has heavy workload and complex construction technology, which has a high requirement on the professional quality of on-site technicians and installation personnel. ZOZEN Boiler optimized the construction plan and sent technicians to the site to guide the boiler installation, which safeguarded the project progress.

 

Customer feedback—— Langfang Enn Fanneng Equipment Sales Co., Ltd.

With the joint effort of the technicians and the installation team of ZOZEN Boiler, the setup of the gas-fired boiler went well. Since the construction of the whole project for more than half a year, ZOZEN Boiler had always fully cooperated with us on the work schedule, overcame the impact of COVID-19 pandemic, arrived at the site to ensure the boiler installation process, and actively promoted the project progress.