zozen boiler
Home Service FAQs FAQ of circulating fluidized bed boilers Why the slag discharge tube of circulating fluidized bed boiler will be blocked?

Why the slag discharge tube of circulating fluidized bed boiler will be blocked?

12 Jul 2018

(Details on the problem) Specific Performance:

Slagging pipe blocks during operation of circulating fluidized bed boiler.

 

Answer:cause of failure:

(1) The internal shape is caused by the limited expansion of the wear-resistant material inside the slag discharge pipe. The internal components of the slag cooler are deformed, affecting the fluidization of the slag cooler; the slag cooler is deactivated for a long time or a single slag cooler is selected for slagging, and the bed material in the deactivated slag cooler is bonded under the influence of steam, which being low temperature coke.

(2) The operating personnel did not grasp the ratio of the fluidized air volume of the slag cooler. Inappropriate air volume ratio resulted in poor ash slag fluidization in the slag cooler.

 

Troubleshooting:

(1) Operation personnel should strengthen understanding of boiler operating conditions, adjust boiler parameters in a timely manner, set up the concept of boiler material dynamic balance, control boiler operating bed pressure at normal values, and try to avoid large boiler slag discharge.

(2) The slag cooler hood should be purged each time the boiler is stopped. It is found that the blocked hood must be opened to control the size of the fuel.

(3) Boiler slagging, slag cooler should be carried out alternately; the slag entering the slag cooler should be fully cooled to ensure the working conditions of slag cooler.

(4) Summarizing the experience of the fluidization air volume of the slag cooler, select the optimization parameters of the squid air volume in each plenum, including the lowest fluidization air volume of the slag cooler to ensure the normal fluidization of the slag cooler under any load.


Related FAQs View More
Related news View More
  • 'Old Friend, New Collaboration' — ZOZEN Steam Boilers Empower Sentury Tire's Morocco Factory
    Following the successful operation and intelligent upgrade of its Thailand factory, Sentury Tire has taken another strategic leap forward. The first batch of tires has officially rolled off the production line at its new Morocco factory, marking a significant milestone in the company's "Go Global 2.0" strategy. As a long-term partner of Sentury Tire, ZOZEN Boiler once again provided strong support with two sets of gas-fired steam boilers, helping the company take a solid step in its global produ...
    17 Dec 2024
  • ZOZEN Energy-saving and Environmental Steam Boilers in Textile Industrial Park
    Anyang, a city known as the "Yubei Textile City," boasts a long history in the textile industry and is an important base for knitting, weaving, and printing and dyeing in Henan Province. In the Beiguan District of Anyang City, the printing and dyeing demonstration park is injecting new vitality into the green development of the textile printing and dyeing industry with an innovative circular economy model that integrates six major functions. As a leader in the industrial boiler industry, ZOZEN&n...
    10 Dec 2024
  • ZOZEN 40-Ton Biomass Steam Boiler Supports General Rubber Project in Thailand
    Under the backdrop of global economic integration, an increasing number of companies are choosing to establish factories overseas. Thailand, as an important base for the global rubber industry, has become a destination for the overseas expansion of many enterprises. The General Rubber Thailand factory, which is the overseas production base of General Shares, was invested in and built in the first phase in 2019 and officially put into operation in January 2020, laying a solid foundation for the d...
    03 Dec 2024

Find the Right Boiler For You

Name *

Email *

WhatsApp/WeChat

Products

Power/Capacity