Why the slag discharge tube of circulating fluidized bed boiler will be blocked?
(Details on the problem) Specific Performance:
Slagging pipe blocks during operation of circulating fluidized bed boiler.
Answer:cause of failure:
(1) The internal shape is caused by the limited expansion of the wear-resistant material inside the slag discharge pipe. The internal components of the slag cooler are deformed, affecting the fluidization of the slag cooler; the slag cooler is deactivated for a long time or a single slag cooler is selected for slagging, and the bed material in the deactivated slag cooler is bonded under the influence of steam, which being low temperature coke.
(2) The operating personnel did not grasp the ratio of the fluidized air volume of the slag cooler. Inappropriate air volume ratio resulted in poor ash slag fluidization in the slag cooler.
Troubleshooting:
(1) Operation personnel should strengthen understanding of boiler operating conditions, adjust boiler parameters in a timely manner, set up the concept of boiler material dynamic balance, control boiler operating bed pressure at normal values, and try to avoid large boiler slag discharge.
(2) The slag cooler hood should be purged each time the boiler is stopped. It is found that the blocked hood must be opened to control the size of the fuel.
(3) Boiler slagging, slag cooler should be carried out alternately; the slag entering the slag cooler should be fully cooled to ensure the working conditions of slag cooler.
(4) Summarizing the experience of the fluidization air volume of the slag cooler, select the optimization parameters of the squid air volume in each plenum, including the lowest fluidization air volume of the slag cooler to ensure the normal fluidization of the slag cooler under any load.
-
QXX coal-fired CFB (circulating fluidized bed) hot water boilerLive Chat14-58 MW1-1.25 MPa
-
DHX coal-fired CFB (circulating fluidized bed) steam boilerLive Chat20-75 t/h1.25-1.6 MPa
-
DHL series coal-fired steam boilerLive Chat20-75 t/h1.25-5.4 MPa
-
Email us
-
WhatsApp: +86 18861589035
WeChat: +86 13506150756
Live Chat

-
Recently, a special equipment inspection team visited Wuxi Zozen Boilers Co., Ltd. for an inspection and guidance session. Mr. Zhang Guoping, General Manager of ZOZEN Boiler, together with representatives from relevant departments, participated in the inspection and discussions. The meeting focused on special equipment production quality management, the implementation of safety responsibilities, manufacturing process control, and documentation management. Special Equipment Inspection Team Con...25 Aug 2026 -
At a local paper manufacturing company in Egypt, a ZOZEN WNS Series 6 t/h gas-fired steam boiler has been supplied as part of an export project. The Egyptian paper mill uses natural gas as the boiler fuel to meet the process steam requirements of paper production. The project also includes technical documents and a product solution prepared in accordance with ASME and CE certification requirements. Paper manufacturing is a continuous industrial process. Steam is involved in several stages, incl...01 Sep 2026 -
Over the past two years, ZOZEN Boiler has supplied gas-fired steam boilers and related services to industrial customers in Venezuela. The applications include beverage production and papermaking. This article presents two projects: a 3 t/h WNS gas-fired steam boiler supplied to a Venezuelan beverage manufacturer and a 15 t/h WNS gas-fired steam boiler supplied to a local paper mill. Steam Supply for Beverage ProductionSteam is used in beverage production for blending, sterilization, equipment ...18 Aug 2026