zozen boiler
Home Service FAQs FAQ of circulating fluidized bed boilers Why the slag discharge tube of circulating fluidized bed boiler will be blocked?

Why the slag discharge tube of circulating fluidized bed boiler will be blocked?

12 Jul 2018

(Details on the problem) Specific Performance:

Slagging pipe blocks during operation of circulating fluidized bed boiler.

 

Answer:cause of failure:

(1) The internal shape is caused by the limited expansion of the wear-resistant material inside the slag discharge pipe. The internal components of the slag cooler are deformed, affecting the fluidization of the slag cooler; the slag cooler is deactivated for a long time or a single slag cooler is selected for slagging, and the bed material in the deactivated slag cooler is bonded under the influence of steam, which being low temperature coke.

(2) The operating personnel did not grasp the ratio of the fluidized air volume of the slag cooler. Inappropriate air volume ratio resulted in poor ash slag fluidization in the slag cooler.

 

Troubleshooting:

(1) Operation personnel should strengthen understanding of boiler operating conditions, adjust boiler parameters in a timely manner, set up the concept of boiler material dynamic balance, control boiler operating bed pressure at normal values, and try to avoid large boiler slag discharge.

(2) The slag cooler hood should be purged each time the boiler is stopped. It is found that the blocked hood must be opened to control the size of the fuel.

(3) Boiler slagging, slag cooler should be carried out alternately; the slag entering the slag cooler should be fully cooled to ensure the working conditions of slag cooler.

(4) Summarizing the experience of the fluidization air volume of the slag cooler, select the optimization parameters of the squid air volume in each plenum, including the lowest fluidization air volume of the slag cooler to ensure the normal fluidization of the slag cooler under any load.


Related FAQs View More
Related news View More
  • ASME Certification Powers ZOZEN Boiler’s Multi-Industry, Multi-Region Growth
    Against the backdrop of accelerated global carbon reduction and increasingly stringent safety and environmental supervision, internationally recognized compliance qualifications have become an important foundation for industrial equipment manufacturers to expand into overseas markets. With ASME (American Society of Mechanical Engineers) certification as a core cornerstone, ZOZEN Boiler continues to advance the international upgrade of product compliance and engineering service capabilities, driv...
    13 Jan 2026
  • ZOZEN Boiler 2026 Annual Conference and 2025 Commendation Ceremony Successfully Conclude
    On January 6, Wuxi ZOZEN Boiler Co., Ltd. held its 2026 Annual Conference and the 2025 Commendation Ceremony for Advanced Teams and Outstanding Employees under the theme “United to Set Out — Uphold Integrity, Advance with Intelligence.” General Manager Zhang Guoping gathered with all employees to review the company’s journey, honor annual contributions, and chart the path forward. Looking back: Steady progress through perseverance and breakthroughsThe conference opened w...
    07 Jan 2026
  • ZOZEN Boiler’s 2025 Global Exhibition Tour: Deepening Overseas Market Deployment
    In 2025, ZOZEN Boiler is leveraging a series of international exhibitions to continue cultivating overseas markets. From Asia’s Pakistan Textile Expo to Europe’s Russian HVAC and Boiler Exhibition and Industrial Boiler & Heat Exchange Exhibition, and onward to Serbia’s TOPS Scientific Seminar, ZOZEN showcased its high-efficiency, eco-friendly boiler products and customized energy solutions to global customers—demonstrating strong technological capability and market co...
    30 Dec 2025

Find the Right Boiler For You

Name *

Email *

WhatsApp/WeChat

Products

Power/Capacity