Why the slag discharge tube of circulating fluidized bed boiler will be blocked?
(Details on the problem) Specific Performance:
Slagging pipe blocks during operation of circulating fluidized bed boiler.
Answer:cause of failure:
(1) The internal shape is caused by the limited expansion of the wear-resistant material inside the slag discharge pipe. The internal components of the slag cooler are deformed, affecting the fluidization of the slag cooler; the slag cooler is deactivated for a long time or a single slag cooler is selected for slagging, and the bed material in the deactivated slag cooler is bonded under the influence of steam, which being low temperature coke.
(2) The operating personnel did not grasp the ratio of the fluidized air volume of the slag cooler. Inappropriate air volume ratio resulted in poor ash slag fluidization in the slag cooler.
Troubleshooting:
(1) Operation personnel should strengthen understanding of boiler operating conditions, adjust boiler parameters in a timely manner, set up the concept of boiler material dynamic balance, control boiler operating bed pressure at normal values, and try to avoid large boiler slag discharge.
(2) The slag cooler hood should be purged each time the boiler is stopped. It is found that the blocked hood must be opened to control the size of the fuel.
(3) Boiler slagging, slag cooler should be carried out alternately; the slag entering the slag cooler should be fully cooled to ensure the working conditions of slag cooler.
(4) Summarizing the experience of the fluidization air volume of the slag cooler, select the optimization parameters of the squid air volume in each plenum, including the lowest fluidization air volume of the slag cooler to ensure the normal fluidization of the slag cooler under any load.
-
QXX coal-fired CFB (circulating fluidized bed) hot water boilerLive Chat14-58 MW1-1.25 MPa
-
DHX coal-fired CFB (circulating fluidized bed) steam boilerLive Chat20-75 t/h1.25-1.6 MPa
-
DHL series coal-fired steam boilerLive Chat20-75 t/h1.25-5.4 MPa
-
Email us
-
WhatsApp: +86 18861589035
WeChat: +86 13506150756
Live Chat

-
On October 1, 2026, local time, the three-day AHR Expo Mexico 2026 came to a close at the Expo Guadalajara Convention Center. The ZOZEN Boiler sales team traveled to Mexico to participate in the exhibition. At Booth 1847, the team presented industrial boiler products and used the event as an opportunity to learn more about industrial heat demand in Mexico and across Latin America. AHR Expo Mexico 2026 exhibition site At the entrance to the exhibition, the “AHR Expo Mexico 2026” s...13 Oct 2026 -
Cambodian rice processor AMRU Rice generates a large amount of rice husk during production and requires a stable steam supply for cleaning, steaming, drying, and other processing stages. Based on the company’s fuel availability and steam demand, ZOZEN Boiler supplied an ASME-compliant DZL series single-drum biomass boiler. The boiler converts rice processing by-products into thermal energy and provides continuous steam for the production line. ZOZEN DZL Biomass Steam Boiler Supports Ric...06 Oct 2026 -
Recently, activities related to the China-ASEAN Expo have continued to attract attention. As an important economic and trade platform connecting China and ASEAN markets, the China-ASEAN Expo brings together enterprises, buyers, and industry organizations from different countries and regions. It provides manufacturing companies with opportunities to understand market demand, present product solutions, and conduct business exchanges. The 23rd China-ASEAN Expo Concludes Successfully During the ...29 Sep 2026