zozen boiler
Home Service FAQs Boiler basics What are the conditions and preparations for low-pressure boiler furnace drying?

What are the conditions and preparations for low-pressure boiler furnace drying?

14 Jan 2022

(1) The boiler and all auxiliary equipment are installed, and all tests such as ball passing test, hydrostatic test and air tightness test are qualified.

(2) All rotating devices, feed water pumps, condensate pumps, salt solution pumps, blowers and induced draft fans for coal conveying, combustion and ash removal are qualified for trial operation.

(3) The fuel and water supply are guaranteed, the steam, water and flue gas piping system are normal, and the connection unrelated to the boiler to be dried is cut off and isolated.

(4) All testing and measuring instruments, safety protection and control systems are normal, and all tools and materials used during the furnace drying are fully prepared.

Related FAQs View More
Related news View More
  • A Long-Run Story of an Old Boiler: ZOZEN WNS Series Gas-Fired Boiler Operating for 16 Years
    At the production site of a pharmaceutical company in Shanghai, a ZOZEN gas-fired steam boiler commissioned in 2010 has been operating steadily for 16 years. For this established pharmaceutical company, founded in 1995, the steam system is closely related to production rhythm, process coordination, and on-site operation support. Whether the equipment can maintain stable operation over the long term directly affects the continuity of daily production. Time is a practical test, and the continuous ...
    07 Jul 2026
  • A Boiler Generating Steam for Brewed Aroma: ZOZEN Boiler Supports Green Production at Yanjing Beer
    As the beer industry moves toward greener, more continuous, and more refined production, the steam system has become an important part of brewing operations. Recently, the cooperation case between ZOZEN Boiler and Yanjing Beer (Guilin Liquan) Co., Ltd. once again highlighted the essential role and system value of industrial boiler equipment in the food and beverage industry. Industrial Heat and Beer Brewing Are Closely Connected From a Drop of Beer, the Value of Stable Steam Becomes ClearYan...
    24 Jun 2026
  • ZOZEN Skid-Mounted Boiler Exported to Thailand Supporting a Stationery Manufacturer
    Recently, ZOZEN Boiler delivered a 3-ton WNS series skid-mounted steam boiler to a stationery products manufacturer in Thailand. The customer mainly produces solid glue, crayons, oil pastels and other stationery products. During production, the customer has clear requirements for continuous and stable steam supply. Based on the customer’s process features and site conditions, ZOZEN Boiler adopted a skid-mounted delivery solution, integrating the boiler body and auxiliary equipment to suppo...
    16 Jun 2026

Find the Right Boiler For You

Name *

Email *

WhatsApp/WeChat

Products

Power/Capacity