zozen boiler
Home Service FAQs Boiler basics What are the conditions and preparations for low-pressure boiler furnace drying?

What are the conditions and preparations for low-pressure boiler furnace drying?

14 Jan 2022

(1) The boiler and all auxiliary equipment are installed, and all tests such as ball passing test, hydrostatic test and air tightness test are qualified.

(2) All rotating devices, feed water pumps, condensate pumps, salt solution pumps, blowers and induced draft fans for coal conveying, combustion and ash removal are qualified for trial operation.

(3) The fuel and water supply are guaranteed, the steam, water and flue gas piping system are normal, and the connection unrelated to the boiler to be dried is cut off and isolated.

(4) All testing and measuring instruments, safety protection and control systems are normal, and all tools and materials used during the furnace drying are fully prepared.

Related FAQs View More
Related news View More
  • ZOZEN Boiler Expands African Footprint: High-Efficiency Coal-Fired Steam Boiler Dispatched to Zimbabwe
    Recently, at the modern production base of Wuxi ZOZEN Boiler Co., Ltd. (hereinafter referred to as "ZOZEN Boiler"), a set of SZL series coal-fired steam boiler has completed strict quality inspection and packaging processes and was officially loaded for shipment to Zimbabwe. As an export-oriented boiler manufacturer, ZOZEN Boiler's cooperation with a well-known Zimbabwean paper enterprise is not only a reflection of "Made in China" deepening its presence in the African market but also a testamen...
    03 Mar 2026
  • ZOZEN Boiler 2026 Sales Conference Successfully Held
    Spring brings new life and new beginnings. On February 25, 2026, the ninth day of the first lunar month—a date symbolizing longevity and good fortune—the "2026 ZOZEN Boiler Sales Conference & 2025 Annual Sales Awards Ceremony" was successfully held at the ZOZEN headquarters by Taihu Lake, Wuxi. The conference was themed "United We Start: Upholding Integrity with Innovation, Marching Towards Intelligence." General Manager Mr. Zhang Guoping, department heads, and the entire domest...
    25 Feb 2026
  • Guarding the Flavor of the "Red Industry": ZOZEN Gas Steam Boiler Solves Pain Points in Tomato Processing
    Every August to September, Xinjiang welcomes a grand feast of red harvest. As a globally significant production base for tomato paste, tomato products here are renowned for their high lycopene content. However, for tomato processing enterprises, this is not just a harvest season, but a race against time. The tomato maturity period is concentrated, and fresh fruit is difficult to store, leaving a processing window of only 45 to 55 days. Once equipment downtime occurs, mountains of fresh fruit wil...
    17 Feb 2026

Find the Right Boiler For You

Name *

Email *

WhatsApp/WeChat

Products

Power/Capacity