zozen boiler
Home Service FAQs Boiler basics What is the process and operation of low-pressure boiler furnace drying?

What is the process and operation of low-pressure boiler furnace drying?

14 Jan 2022

(1) The furnace drying time depends on the shape, structure and humidity of the furnace. It takes 4 ~ 7 days for small low-pressure boilers and 10 ~ 15 days for heavy furnace walls.

(2) First, bake with wood, on the ash hopper of the room furnace and the grate of the chain furnace, use small fire for natural ventilation within 2 ~ 3 hours. When the temperature of combustion chamber rises, the ventilation capacity will be improved, and the flue damper can be turned down a little. It is best to keep the exhaust temperature below 25℃ on the first day.

(3) The next day, the fire can be enlarged and placed in the center of the grate, and the water temperature in the boiler should not exceed 70℃. On the third day, coal is added to the fire, and it is gradually baked with coal.

(4) Starting from the fourth day, only use coal to burn, start the induced draft fan, increase the furnace temperature, and keep the negative pressure of the furnace at 5 ~ 10 Pa [0.5 ~ 1 mm H2O].

(5) The temperature of the low-pressure boiler should be slowly increased when drying, and the temperature rise should be controlled at 20 ~ 40℃ every day. The flame should be evenly distributed, and it should not lean on one side of the furnace wall or under the front or rear arch of the chain furnace. To prevent the chain grate from burning out, the chain grate should rotate regularly. The boiler water level should be kept at the lowest level during the furnace drying. Check frequently during furnace drying, and take remedial measures if cracks or pits are found.

Related FAQs View More
Related news View More
  • A 10 TPH Boiler Delivered in 40 Days: The “ZOZEN Speed” Behind Yanjing Beer’s Letter of Appreciation
    Recently, Wuxi Zozen Boilers Co., Ltd. received a letter of appreciation from Yanjing Beer (Guilin Lijiang) Co., Ltd. In the letter, the customer expressed appreciation for ZOZEN Boiler’s responsiveness, coordination, and delivery support throughout the project. The customer also noted that ZOZEN helped resolve issues related to scheme adjustments, equipment access, and the delivery schedule. Letter of appreciation from Yanjing Beer (Guilin Lijiang) Co., Ltd. The letter was related to ...
    04 Aug 2026
  • ZOZEN Boiler Continues to Deepen 6S Management: From Workplace Standards to Manufacturing Coordination
    In industrial boiler manufacturing, the condition of materials, the organization of work areas, coordination between production processes, and safety requirements all affect the stability of manufacturing operations. As a boiler manufacturer, ZOZEN Boiler continues to promote 6S management by integrating Seiri, Seiton, Seiso, Seiketsu, Shitsuke, and Safety into daily workshop operations. The company is extending 6S management from workplace improvement to material control, process coordination, ...
    28 Jul 2026
  • Solemn Statement of ZOZEN Boiler on Combating Counterfeiting and Infringement
    In recent years, Wuxi ZOZEN Boilers Co., Ltd. (“ZOZEN Boiler”) has continued to develop the domestic and overseas industrial boiler markets. With stable and reliable product quality, comprehensive technical services, and sound brand reputation, its products have been widely applied in various industries, including food, chemical, textile, paper, pharmaceutical, and new energy industries, and have been exported to multiple countries and regions worldwide. As the brand influence of ZO...
    27 Jul 2026

Find the Right Boiler For You

Name *

Email *

WhatsApp/WeChat

Products

Power/Capacity