zozen boiler
Home Service FAQs Boiler basics What is the process and operation of low-pressure boiler furnace drying?

What is the process and operation of low-pressure boiler furnace drying?

14 Jan 2022

(1) The furnace drying time depends on the shape, structure and humidity of the furnace. It takes 4 ~ 7 days for small low-pressure boilers and 10 ~ 15 days for heavy furnace walls.

(2) First, bake with wood, on the ash hopper of the room furnace and the grate of the chain furnace, use small fire for natural ventilation within 2 ~ 3 hours. When the temperature of combustion chamber rises, the ventilation capacity will be improved, and the flue damper can be turned down a little. It is best to keep the exhaust temperature below 25℃ on the first day.

(3) The next day, the fire can be enlarged and placed in the center of the grate, and the water temperature in the boiler should not exceed 70℃. On the third day, coal is added to the fire, and it is gradually baked with coal.

(4) Starting from the fourth day, only use coal to burn, start the induced draft fan, increase the furnace temperature, and keep the negative pressure of the furnace at 5 ~ 10 Pa [0.5 ~ 1 mm H2O].

(5) The temperature of the low-pressure boiler should be slowly increased when drying, and the temperature rise should be controlled at 20 ~ 40℃ every day. The flame should be evenly distributed, and it should not lean on one side of the furnace wall or under the front or rear arch of the chain furnace. To prevent the chain grate from burning out, the chain grate should rotate regularly. The boiler water level should be kept at the lowest level during the furnace drying. Check frequently during furnace drying, and take remedial measures if cracks or pits are found.

Related FAQs View More
Related news View More
  • World Cup Spotlight on the Americas: How a Chinese Boiler Reached an Overseas Production Line
    As the 2026 FIFA World Cup brings the United States, Mexico and Canada into the international spotlight, attention is once again turning to the cities, industries and communities across North America. Away from the stadiums, manufacturing plants, beverage production lines and automotive component facilities continue their daily operations, providing steady support for local economies. ZOZEN Boiler’s WNS Series Serving Industrial Projects in North America In these less visible parts of ...
    14 Jul 2026
  • A Long-Run Story of an Old Boiler: ZOZEN WNS Series Gas-Fired Boiler Operating for 16 Years
    At the production site of a pharmaceutical company in Shanghai, a ZOZEN gas-fired steam boiler commissioned in 2010 has been operating steadily for 16 years. For this established pharmaceutical company, founded in 1995, the steam system is closely related to production rhythm, process coordination, and on-site operation support. Whether the equipment can maintain stable operation over the long term directly affects the continuity of daily production. Time is a practical test, and the continuous ...
    07 Jul 2026
  • A Boiler Generating Steam for Brewed Aroma: ZOZEN Boiler Supports Green Production at Yanjing Beer
    As the beer industry moves toward greener, more continuous, and more refined production, the steam system has become an important part of brewing operations. Recently, the cooperation case between ZOZEN Boiler and Yanjing Beer (Guilin Liquan) Co., Ltd. once again highlighted the essential role and system value of industrial boiler equipment in the food and beverage industry. Industrial Heat and Beer Brewing Are Closely Connected From a Drop of Beer, the Value of Stable Steam Becomes ClearYan...
    24 Jun 2026

Find the Right Boiler For You

Name *

Email *

WhatsApp/WeChat

Products

Power/Capacity