What are the reasons for insufficient burning in the coal chain grate boilers?
The first reason is unreasonable structural design.
In the operation of chain grate boiler, uneven distribution of short coal seams in grate, improper adjustment of coal feeder, unreasonable control of coal seams and poor regulation performance of air supply volume in air chamber will all lead to insufficient burning of coal.
The second reason is unreasonable setting of secondary air.
If the primary wind speed is too high, the air volume is too large, and the air rate is too large, the pulverized coal concentration is obviously low, and insufficient preheating will cause the ignition point of pulverized coal to increase, and successive flames cannot be formed. Improper selection of secondary air distribution will greatly reduce the flame temperature.
The third reason is coal quality.
The basic requirements of the boiler for fuel are very high. The coal with the particle size of 25mm-40mm is less than 30%, the large particle size is less than 40mm, the moisture is 12%-20%, the volatile matter is greater than 18%, the calorific value is greater than 4200 kcal/kg, and the ash melting point is not lower than 1100℃. If the ash content in coal increases and the evaporation content is low, it is not conducive to the dispersed combustion of pulverized coal.
-
DZL series coal-fired steam boilerLive Chat2-10 t/h1-2.5 MPa
-
SZL series coal-fired steam boilerLive Chat6-35 t/h1-2.5 MPa
-
DHL series coal-fired steam boilerLive Chat20-75 t/h1.25-5.4 MPa
-
Email us
-
WhatsApp: +86 18861589035
WeChat: +86 13506150756
Live Chat

-
From May 6 to 7, 2026, PALMEX JAKARTA 2026, the International Palm Oil Industry Equipment Exhibition, was held at JIEXPO in Jakarta, Indonesia. At booths 190 & 192, ZOZEN Boiler presented its boiler products and thermal energy solutions for industries such as palm oil processing. During the two-day exhibition, ZOZEN welcomed multiple groups of visitors, including existing clients and new prospects. Some new visitors returned to the booth several times for further discussions, and the overall...12 May 2026 -
ZOZEN Boiler has recently shipped a 10-ton WNS series heavy oil steam boiler to Ecuador, where it will support the production line of a local corrugated board packaging company. The project marks another step in ZOZEN’s expansion in Ecuador’s paper industry and reflects growing demand in South America for reliable steam supply, fuel adaptability, and after-sales support. ZOZEN WNS series heavy oil condensing steam boiler Stable steam supply matters in paper productionIn paper and...05 May 2026 -
From May 6 to 7, 2026, ZOZEN Boiler will participate in Palmex Indonesia 2026 at Jakarta International Expo (JIEXPO), Indonesia. ZOZEN Boiler will welcome visitors at Booth 190 & 192. As an industry event focused on the palm oil sector in Southeast Asia, the exhibition brings together companies involved in palm oil processing, supporting energy systems, and industrial equipment, offering ZOZEN Boiler a valuable opportunity to meet customers from Indonesia and surrounding markets. ZOZEN Bo...28 Apr 2026











