zozen boiler
Home Service FAQs FAQ of biomass-fired boilers What are the reasons for the incomplete combustion of biomass in the biomass-fired boiler?

What are the reasons for the incomplete combustion of biomass in the biomass-fired boiler?

11 Sep 2020

The reasons for the incomplete combustion of biomass:

1) Furnace temperature. The incomplete combustion of biomass in the boiler is related to the temperature in the furnace. If the furnace temperature is lower than 600 degrees Celsius, it can not provide a good combustion environment for the biomass, and incomplete combustion will occur.

2) Air supply. Air is inseparable for the combustion of any substance. If the air supply is insufficient or the air is not well mixed with biomass pellets under sufficient conditions, the air supply can not meet the needs of complete combustion of combustible components in the fuel, which results in the incomplete combustion of biomass.

3) Fuel moisture. If the biomass fuel moisture is too high like more than 45%, incomplete combustion will occur.

4) Biomass pellets. The biomass fuel has common shapes such as particles and lumps. If the biomass pellets are too large, incomplete combustion will occur.

5) Ash content. If the biomass is of low quality, it means the ash content is large, whichwill cause the ash content to be packaged into the burning part, resulting in slower fuel combustion.

6) Feeding. If the hand-fired or chain-linked biomass boilers that exceed the specified fuel amount, the fabric layer on the grate will be too thick and the gas and solid cannot be mixed benignly, so incomplete combustion is easy to occur. Too little feeding will cause insufficient heat storage capacity of the grate's feed layer and incomplete combustion of fuel.

Related FAQs View More
Related news View More
  • Heating Solutions, Local Support: ZOZEN Boiler’s Approach to Expanding in Vietnam
    Industrial heating upgrades can have a direct impact on a factory’s production schedule and operational stability. For manufacturers investing in new facilities or upgrading equipment in Vietnam, boiler selection involves more than fuel costs. Process temperatures, continuous heat supply, emission requirements, and long-term maintenance must all be taken into account. Whether transitioning from coal to natural gas or biomass, manufacturers need a heating solution tailored to their actual p...
    17 Nov 2026
  • Energy Costs and Stable Steam Supply Draw Attention as ZOZEN Boiler Provides Diverse Steam Solutions for Textile Enterprises Worldwide
    From spinning and weaving to dyeing, printing and heat setting, steam is required throughout multiple stages of textile production. As textile enterprises pay closer attention to energy costs, steam supply stability and emission requirements, boiler selection can no longer be based solely on rated evaporation capacity. Local fuel availability, production load, boiler room conditions and ongoing operation and maintenance also need to be considered. Recent textile projects served by ZOZEN Boiler ...
    10 Nov 2026
  • ZOZEN Boiler Supports Building Materials Projects in Hubei with Steam and Thermal Oil Solutions
    IntroductionIn Wuhan, Hubei Province, Hubei Hanjia New Materials Co., Ltd. and Wuhan Yiqingsheng Building Materials Co., Ltd. required thermal energy equipment for autoclave curing and continuous production-line heating, respectively. Based on the production processes, fuel conditions and site requirements of the two companies, ZOZEN Boiler supplied an 8 t/h DZL series biomass steam boiler and a 7.2-million-kcal YWW series biomass thermal oil boiler. The two projects use different heat-transfer ...
    03 Nov 2026

Find the Right Boiler For You

Name *

Email *

WhatsApp/WeChat

Products

Power/Capacity