What is the basic requirement on the hot water boiler system?
a) Boiler hot water system design should meet the requirements of Code For Design of Boiler Plant GB50041.
b) Steam collecting device should be installed in the highest position of hot water system and the position where is easy to collect steam. Reliable constant pressure measures and circulating water expansion device should also be set to ensure that pressure in system is not lower than the corresponding saturation pressure of outlet water temperature plus 20 °C so as to avoid boiler water evaporation.
c) Constant pressure measures of low temperature hot water supply system can be realized by the expansion tank that installed in the highest position of system. In the high temperature hot water heating system, due to the high requirements of the stability of system water volume and operation, nitrogen constant tank is commonly used instead of expansion constant tank. Besides using expansion water tank and nitrogen constant tank, measures like constant pressure for automatic make-up water pump should be taken into consideration.
d) Steam collecting device should be installed in the highest position of system and the place where is easy to collect steam. Automatic water supply device shall be installed in the system and manual water supply device shall be installed at the place easy for operation.
e) There should be at least two water circulating pumps in forced circulation hot water system. When one of them stops running, total water flow of others shall meet the requirements of the largest circulation water volume.
f) Install by-pass pipe with check valve between front and rear pipeline of water circulating pump or adopt other measures to prevent water hammer when pump stops suddenly.
g) Dirt separator shall be installed at return water mains of system and dirt separator shall be installed at the place easy for operation to facilitate regular cleaning.
h) Boiler water quality shall be in accordance with Water Quality for Industrial Boilers GB1576.
-
WNS series gas-fired (oil-fired) hot water boilerLive Chat0.7-14 MW0.7-1.25 MPa
-
SZS series gas-fired (oil-fired) hot water boilerLive Chat7-116 MW1-1.6 MPa
-
DZL series coal-fired hot water boilerLive Chat1.4-7 MW0.7-1.25 MPa
-
Email us
-
WhatsApp: +86 18861589035
WeChat: +86 13506150756
Live Chat
-
The continuous growth of the building materials industry places higher demands on thermal energy supply in production—stable steam output, efficient energy utilization, and emissions that meet environmental standards have become core criteria for selecting boiler equipment. Leveraging a deep understanding of industry-specific production needs, ZOZEN Boiler provides customized products and technical advantages to deliver reliable thermal energy support for building materials enterprises at ...21 Oct 2025
-
ZOZEN Boiler Breaks the High Humidity Biomass Combustion Challenge with DZW Series Reciprocating Grate Biomass Steam Boiler Recently, Jinzhi Morning Hong Paper Co., Ltd. (hereinafter referred to as "Morning Hong Paper") reached an important cooperation with ZOZEN Boiler, successfully introducing the DZW series reciprocating grate biomass steam boiler. This brings new impetus for efficient and green production to the company. As a leading paper product manufacturer in North China, Morning Hong P...14 Oct 2025
-
From October 21 to 23, the Heatpower Expo, Russia’s premier industrial boiler and heat exchange exhibition, will be held at the Crocus International Expo Center. As a benchmark event in the industrial boiler and heat exchange equipment sector in Russia, the expo serves as both a window into industry trends and a high-energy platform for fostering practical cooperation. ZOZEN Boiler’s Russian-speaking sales team will participate with its core boiler solutions, demonstrating clean, eff...07 Oct 2025