What is the basic requirement on the hot water boiler system?
a) Boiler hot water system design should meet the requirements of Code For Design of Boiler Plant GB50041.
b) Steam collecting device should be installed in the highest position of hot water system and the position where is easy to collect steam. Reliable constant pressure measures and circulating water expansion device should also be set to ensure that pressure in system is not lower than the corresponding saturation pressure of outlet water temperature plus 20 °C so as to avoid boiler water evaporation.
c) Constant pressure measures of low temperature hot water supply system can be realized by the expansion tank that installed in the highest position of system. In the high temperature hot water heating system, due to the high requirements of the stability of system water volume and operation, nitrogen constant tank is commonly used instead of expansion constant tank. Besides using expansion water tank and nitrogen constant tank, measures like constant pressure for automatic make-up water pump should be taken into consideration.
d) Steam collecting device should be installed in the highest position of system and the place where is easy to collect steam. Automatic water supply device shall be installed in the system and manual water supply device shall be installed at the place easy for operation.
e) There should be at least two water circulating pumps in forced circulation hot water system. When one of them stops running, total water flow of others shall meet the requirements of the largest circulation water volume.
f) Install by-pass pipe with check valve between front and rear pipeline of water circulating pump or adopt other measures to prevent water hammer when pump stops suddenly.
g) Dirt separator shall be installed at return water mains of system and dirt separator shall be installed at the place easy for operation to facilitate regular cleaning.
h) Boiler water quality shall be in accordance with Water Quality for Industrial Boilers GB1576.
-
WNS series gas-fired (oil-fired) hot water boilerLive Chat0.7-14 MW0.7-1.25 MPa
-
SZS series gas-fired (oil-fired) hot water boilerLive Chat7-116 MW1-1.6 MPa
-
DZL series coal-fired hot water boilerLive Chat1.4-7 MW0.7-1.25 MPa
-
Email us
-
WhatsApp: +86 18861589035
WeChat: +86 13506150756
Live Chat

-
Industrial heating upgrades can have a direct impact on a factory’s production schedule and operational stability. For manufacturers investing in new facilities or upgrading equipment in Vietnam, boiler selection involves more than fuel costs. Process temperatures, continuous heat supply, emission requirements, and long-term maintenance must all be taken into account. Whether transitioning from coal to natural gas or biomass, manufacturers need a heating solution tailored to their actual p...17 Nov 2026 -
From spinning and weaving to dyeing, printing and heat setting, steam is required throughout multiple stages of textile production. As textile enterprises pay closer attention to energy costs, steam supply stability and emission requirements, boiler selection can no longer be based solely on rated evaporation capacity. Local fuel availability, production load, boiler room conditions and ongoing operation and maintenance also need to be considered. Recent textile projects served by ZOZEN Boiler ...10 Nov 2026 -
IntroductionIn Wuhan, Hubei Province, Hubei Hanjia New Materials Co., Ltd. and Wuhan Yiqingsheng Building Materials Co., Ltd. required thermal energy equipment for autoclave curing and continuous production-line heating, respectively. Based on the production processes, fuel conditions and site requirements of the two companies, ZOZEN Boiler supplied an 8 t/h DZL series biomass steam boiler and a 7.2-million-kcal YWW series biomass thermal oil boiler. The two projects use different heat-transfer ...03 Nov 2026