What is the basic requirement on the hot water boiler system?
a) Boiler hot water system design should meet the requirements of Code For Design of Boiler Plant GB50041.
b) Steam collecting device should be installed in the highest position of hot water system and the position where is easy to collect steam. Reliable constant pressure measures and circulating water expansion device should also be set to ensure that pressure in system is not lower than the corresponding saturation pressure of outlet water temperature plus 20 °C so as to avoid boiler water evaporation.
c) Constant pressure measures of low temperature hot water supply system can be realized by the expansion tank that installed in the highest position of system. In the high temperature hot water heating system, due to the high requirements of the stability of system water volume and operation, nitrogen constant tank is commonly used instead of expansion constant tank. Besides using expansion water tank and nitrogen constant tank, measures like constant pressure for automatic make-up water pump should be taken into consideration.
d) Steam collecting device should be installed in the highest position of system and the place where is easy to collect steam. Automatic water supply device shall be installed in the system and manual water supply device shall be installed at the place easy for operation.
e) There should be at least two water circulating pumps in forced circulation hot water system. When one of them stops running, total water flow of others shall meet the requirements of the largest circulation water volume.
f) Install by-pass pipe with check valve between front and rear pipeline of water circulating pump or adopt other measures to prevent water hammer when pump stops suddenly.
g) Dirt separator shall be installed at return water mains of system and dirt separator shall be installed at the place easy for operation to facilitate regular cleaning.
h) Boiler water quality shall be in accordance with Water Quality for Industrial Boilers GB1576.
-
WNS series gas-fired (oil-fired) hot water boilerLive Chat0.7-14 MW0.7-1.25 MPa
-
SZS series gas-fired (oil-fired) hot water boilerLive Chat7-116 MW1-1.6 MPa
-
DZL series coal-fired hot water boilerLive Chat1.4-7 MW0.7-1.25 MPa
-
Email us
-
WhatsApp: +86 18861589035
WeChat: +86 13506150756
Live Chat

-
Over the past two years, ZOZEN Boiler has supplied gas-fired steam boilers and related services to industrial customers in Venezuela. The applications include beverage production and papermaking. This article presents two projects: a 3 t/h WNS gas-fired steam boiler supplied to a Venezuelan beverage manufacturer and a 15 t/h WNS gas-fired steam boiler supplied to a local paper mill. Steam Supply for Beverage ProductionSteam is used in beverage production for blending, sterilization, equipment ...18 Aug 2026 -
Baijiu production is a continuous process. From grain steaming and fermentation to distillation, sterilization, and fermented-grain residue handling, many stages require a stable steam supply. As baijiu producers expand their operations, boiler systems need to provide sufficient steam while also adapting to different fuel conditions, changing loads, and environmental management requirements. In recent years, ZOZEN Boiler has developed steam boiler and auxiliary system solutions for baijiu produ...11 Aug 2026 -
A 10 TPH Boiler Delivered in 40 Days: The “ZOZEN Speed” Behind Yanjing Beer’s Letter of AppreciationRecently, Wuxi Zozen Boilers Co., Ltd. received a letter of appreciation from Yanjing Beer (Guilin Lijiang) Co., Ltd. In the letter, the customer expressed appreciation for ZOZEN Boiler’s responsiveness, coordination, and delivery support throughout the project. The customer also noted that ZOZEN helped resolve issues related to scheme adjustments, equipment access, and the delivery schedule. Letter of appreciation from Yanjing Beer (Guilin Lijiang) Co., Ltd. The letter was related to ...04 Aug 2026