zozen boiler
Home Media News Latest news oil burner nox 100ppm steam boiler, if you have any doubt, please find the professional boiler manufacturer Wuxi ZOZEN

oil burner nox 100ppm steam boiler, if you have any doubt, please find the professional boiler manufacturer Wuxi ZOZEN

22 Mar 2021

2020 is the start year of the construction of ZOZEN Boiler’s lean factory. As one of the key tasks of this year, based on the successful application of MES (manufacturing enterprise production process execution management system) informatization, ZOZEN Boiler will adhere to the lean management concept to build the digital lean factory, and implement the standardization of operation and workflow in every process of production and operation, oil burner nox 100ppm steam boiler.

2020 is full of challenges and pressures. ZOZEN Boiler is not afraid of wind and rain, and is advancing all the way. At the beginning of the second half of the year, with its outstanding performance in project construction management, ZOZEN Boiler was rated as “Excellent Project Team” by Wuwei Yili Project Team.

All equipment is designed to be installed on one or two prepared concrete bases
All equipment is designed to be installed on one or two prepared concrete bases

ZOZEN DHL series coal-fired boiler is field assembled and has an external drum, which has the advantages of compact structure, low steel consumption, and fast heating of the corner tube boiler. It also adopts the front and rear arch covering furnace structure to build the refractory concrete  in the lower section of the front wall of the furnace. The front arch is the fire arch, while the rear arch is the ignition arch.

The grate bracket of ZOZEN’s chain grate boilers adopts double-layer structure. The lower layer uses channel steel and the upper layer uses light rail. The upper layer is heated and the lower layer is stressed. It changes the traditional grate bracket using angle steel and friction strips without  deformation. The active grate runs on the light rail with a 72-hour cold test run carried out before leaving the factory to ensure the smooth operation of grate without deviation or jamming, oil burner nox 100ppm steam boiler.

ZOZEN Boiler has set up seven process stop points that are material re-inspection, material inspection number transfer, plate welding test, heat treatment, pre-expansion before welding, flaw detection inspection, hydrostatic test, which are inspected by seven responsible engineers. If any link is unqualified, it will not be able to proceed to the next process, which ensures that each ZOZEN boiler has the high quality.

Last week, ZOZEN gas-fired hot water boilers operating at various heating enterprises of Harbin Investment Group had been ignited one after another. The heating system would be operated in the hot state on October 11, which allowed users to feel the warmth of clean heating in advance. Harbin Investment Group is responsible for 7 heating districts in Harbin, with a heating area of 142 million square meters, accounting for about 43% of the heating area in the city’s main urban area, and serves 1.36 million users. The stable operation of ZOZEN hot water boilers had effectively affected the heating experience of most residents in Harbin, oil burner nox 100ppm steam boiler.

In the future, ZOZEN will continue to play its own Advantages in the field of industrial boiler manufacturing and provide high-quality boiler products for more enterprises to lay a solid foundation for development.

Related news View More
  • Heating Solutions, Local Support: ZOZEN Boiler’s Approach to Expanding in Vietnam
    Industrial heating upgrades can have a direct impact on a factory’s production schedule and operational stability. For manufacturers investing in new facilities or upgrading equipment in Vietnam, boiler selection involves more than fuel costs. Process temperatures, continuous heat supply, emission requirements, and long-term maintenance must all be taken into account. Whether transitioning from coal to natural gas or biomass, manufacturers need a heating solution tailored to their actual p...
    17 Nov 2026
  • Energy Costs and Stable Steam Supply Draw Attention as ZOZEN Boiler Provides Diverse Steam Solutions for Textile Enterprises Worldwide
    From spinning and weaving to dyeing, printing and heat setting, steam is required throughout multiple stages of textile production. As textile enterprises pay closer attention to energy costs, steam supply stability and emission requirements, boiler selection can no longer be based solely on rated evaporation capacity. Local fuel availability, production load, boiler room conditions and ongoing operation and maintenance also need to be considered. Recent textile projects served by ZOZEN Boiler ...
    10 Nov 2026
  • ZOZEN Boiler Supports Building Materials Projects in Hubei with Steam and Thermal Oil Solutions
    IntroductionIn Wuhan, Hubei Province, Hubei Hanjia New Materials Co., Ltd. and Wuhan Yiqingsheng Building Materials Co., Ltd. required thermal energy equipment for autoclave curing and continuous production-line heating, respectively. Based on the production processes, fuel conditions and site requirements of the two companies, ZOZEN Boiler supplied an 8 t/h DZL series biomass steam boiler and a 7.2-million-kcal YWW series biomass thermal oil boiler. The two projects use different heat-transfer ...
    03 Nov 2026

Find the Right Boiler For You

Name *

Email *

WhatsApp/WeChat

Products

Power/Capacity