zozen boiler
Home Media News Latest news gas fired industrial 4 ton steam boiler condensing gas steam boiler, ZOZEN boiler, a professional industrial boiler manufacturer analyzes the issue detailedly

gas fired industrial 4 ton steam boiler condensing gas steam boiler, ZOZEN boiler, a professional industrial boiler manufacturer analyzes the issue detailedly

25 Apr 2021

As an industrial boiler manufacturing company with more than 30 years of development history, ZOZEN today's achievements are inseparable from its sustainable development concept.  Recently, ZOZEN reached cooperation with Libbey Inc., the global glassware industry giant. The two sides shared the same development concepts and became friendly and trustworthy partners, gas fired industrial 4 ton steam boiler condensing gas steam boiler.

ZOZEN large-scale vertical lathe is suitable for parts with high accuracy and complex shapes

ZOZEN large-scale vertical lathe is suitable for parts with high accuracy and complex shapes
Recently, benefiting from its solid comprehensive strength, ZOZEN reached cooperation with Sinochem Exploration International Petroleum Company, and successfully settled the boiler project in Colombia. SPIC Columbia is a subsidiary of Sinochem Group's petroleum exploration and development business, dedicated to the exploration and development of long-term oil in Colombia. Boilers are essential equipment for oil exploration.

gas fired industrial 4 ton steam boiler condensing gas steam boiler, ZOZEN WNS series gas-fired (oil-fired) boilers are wetback fire-tube boilers with a two-pass or three-pass design. It uses threaded smoke tube for heat transfer and manages to achieve a thermal efficiency up to 98%. The economizer is installed at the tail of boiler, giving the boiler a compact size. Meanwhile, sound automatic control system enables unattended operation.

The grate bracket of ZOZEN’s chain grate boilers adopts double-layer structure. The lower layer uses channel steel and the upper layer uses light rail. The upper layer is heated and the lower layer is stressed. It changes the traditional grate bracket using angle steel and friction strips without  deformation. The active grate runs on the light rail with a 72-hour cold test run carried out before leaving the factory to ensure the smooth operation of grate without deviation or jamming.

ZOZEN Boiler has set up seven process stop points that are material re-inspection, material inspection number transfer, plate welding test, heat treatment, pre-expansion before welding, flaw detection inspection, hydrostatic test, which are inspected by seven responsible engineers. If any link is unqualified, it will not be able to proceed to the next process, which ensures that each ZOZEN boiler has the high quality.

Over the past 40 years of reform and opening up, our country’s wood processing industry has achieved considerable development. Processing logs into the boards that we use is inseparable from the high-temperature steam produced by the boiler for drying. As a large-scale industrial boiler manufacturer with a history of more than 30 years, ZOZEN Boiler has accumulated rich project experience in the wood processing industry. It has achieved the win-win cooperation with Langfang Jiarun Wood Company, Jiangsu Baoyuan Wood Company, Shandong Jiulefu Wood Company and many other enterprises.

If you’re looking for more information about industrial boiler maintenance, ZOZEN has put together a checklist for you. Implementing routine boiler maintenance can result in operational efficiency, cost savings and safer work conditions for your company.

Related news View More
  • Steam Runs Through the Brewing Process: ZOZEN Boiler Supports the Baijiu Industry
    Baijiu production is a continuous process. From grain steaming and fermentation to distillation, sterilization, and fermented-grain residue handling, many stages require a stable steam supply. As baijiu producers expand their operations, boiler systems need to provide sufficient steam while also adapting to different fuel conditions, changing loads, and environmental management requirements. In recent years, ZOZEN Boiler has developed steam boiler and auxiliary system solutions for baijiu produ...
    11 Aug 2026
  • A 10 TPH Boiler Delivered in 40 Days: The “ZOZEN Speed” Behind Yanjing Beer’s Letter of Appreciation
    Recently, Wuxi Zozen Boilers Co., Ltd. received a letter of appreciation from Yanjing Beer (Guilin Lijiang) Co., Ltd. In the letter, the customer expressed appreciation for ZOZEN Boiler’s responsiveness, coordination, and delivery support throughout the project. The customer also noted that ZOZEN helped resolve issues related to scheme adjustments, equipment access, and the delivery schedule. Letter of appreciation from Yanjing Beer (Guilin Lijiang) Co., Ltd. The letter was related to ...
    04 Aug 2026
  • ZOZEN Boiler Continues to Deepen 6S Management: From Workplace Standards to Manufacturing Coordination
    In industrial boiler manufacturing, the condition of materials, the organization of work areas, coordination between production processes, and safety requirements all affect the stability of manufacturing operations. As a boiler manufacturer, ZOZEN Boiler continues to promote 6S management by integrating Seiri, Seiton, Seiso, Seiketsu, Shitsuke, and Safety into daily workshop operations. The company is extending 6S management from workplace improvement to material control, process coordination, ...
    28 Jul 2026

Find the Right Boiler For You

Name *

Email *

WhatsApp/WeChat

Products

Power/Capacity