The excellent quality of ZOZEN Boiler comes from every working procedure. A convection tube bundle consisting of thousands of tubes is arranged between the upper and lower drums of SZS gas-fired boiler, and each tube should be welded with the drum with high quality to ensure tightness and no leakage. In this part of the work, it requires a large amount of welding with strict requirements, and the welding operation condition is tough. However, the employees of ZOZEN frontline cooperate with each other to ensure the efficient and orderly welding of convection bank tubes.