“DHL series biomass fired steam boiler”- related faq

Tags list
  • What are the parameters of a set of 2 tph gas-fired steam boiler? 2020-10-23
    The gas-fired steam boiler is used widely and meets the current environmental protection standards. What are the parameters of a set of 2 tph gas-fired steam boiler and what are the gas fuels?
  • What is the inlet pressure of a gas burner? 2020-05-01
    The inlet gas pressure is different for different capacity boiler, for example, the pressure for 2 ton steam capacity boiler is about 8~10KPa, while for 4 ton steam capacity boiler is about 12~25KPa. You can tell us the boiler capacity you want, we will help you to get the gas inlet pressure. 
  • What is the fuel-to-steam efficiency of an industrial boiler? 2020-01-31
    Fuel-to-steam efficiency is a measure of the overall efficiency of the boiler. It accounts for the effectiveness of the heat exchanger as well as the radiation and convection losses. It is an indication of the true boiler efficiency and should be the efficiency used in economic evaluations. As prescribed by the ASME Power Test Code, PTC 4.1, the fuel-to-steam efficiency of a boiler can be determined by two methods: the InputOutput Method and the Heat Loss Method.
  • Water for the boiler 2020-01-31
    A steam boiler plant must operate safely, with maximum combustion and heat transfer efficiency. To help achieve this and a long, low-maintenance life, the boiler water can be chemically treated. The operating objectives for steam boiler plant include: Safe operation. Maximum combustion and heat transfer efficiency. Minimum maintenance. Long working life. The quality of the water used to produce the steam in the boiler will have a profound effect on meeting these objectives.
  • Understanding ASME Code: What It is and Why It Matters? 2019-11-22
    ASME code – also known by its longer name: ASME Boiler & Pressure Vessel Code – regulates the design, development, and manufacturing of boilers used in a variety of industries and applications. This code was developed by the American Society of Mechanical Engineers, an organization that has been around for well over 100 years and is focused on establishing safety codes and standards for mechanical equipment. Within the industrial heating industry, ASME code is the established standard that many pieces of equipment are built to. Heating systems that adhere to the specifications set forth by ASME code have been constructed according to guidelines intended to promote safety and quality. As such, heating equipment that is ASME code compliant has been thoroughly inspected to assure that it meets high safety and quality standards.
  • Saturated Vs superheat steam conditions 2019-10-18
    In a boiler, energy from the fuel is transferred to liquid water in order to create steam. Once the water is heated to boiling point, it is vaporized and turned into saturated steam. When saturated steam is heated above boiling point, dry steam is created and all traces of moisture are erased. This is called superheated steam.
  • What is the reason for the failure of the coal economizer pipe of the coal-fired boiler? 2018-07-12
    Question details (Performance):1. The furnace wall at the coal economizer leaks water and steam with abnormal sound.2. The water level in the boiler drops sharply, and the water supply is obviously greater than the evaporation capacity.3. Smoke exhaust temperature and water outlet temperature rise.Answer: Fault reason:1. The water quality does not reach standard, and the oxygen in the water is decomposed into corroded pipe walls when the temperature rises.2. The low feed water temperature and smoke exhaust temperature make the inner and outer wall of the coal economizer pipe produce acid corrosion, or flying ash wear the pipe wall thin. 3. The pipe is blocked by impurities, causing overheating.4. Poor materials, defects in manufacturing, installation and maintenance. Troubleshooting:1. When economizer is slightly broke, it still maintains boiler operation, and the gap seems will not expand rapidly, in this case, load operation should be reduced, and start the spare boiler immediately,