ZOZEN SZS series condensing gas-fired boilers are typical high-efficiency, energy-saving and environment-friendly boilers with large furnace volume, sufficient radiant heating surface, sufficient fuel combustion and high thermal efficiency of 98%. With advanced combustion equipment, the emission of nitrogen oxides can be less than 30 mg/nm3.
The production of an industrial boiler with good quality will go through several links, such as blanking, welding, assembly and inspection. ZOZEN Boiler has a set of comprehensive production system and quality control system to assure product quality in the manufacturing process.
SZL series vertical dual drums chain grate water pipe steam and hot water boiler, adopts quick fitting and assembly structure. The 4-6t/h boiler is of quick fitting pipe structure, exit shop after completely assembled, the boiler of 6-35t/h is composed of 2 main components. The upper assembled components is the body heat accepting part, and the lower assembled component is of combustion equipment.
The boiler is additionally provided with an air preheater at the end of the flue gas, and the air is preheated to a certain temperature with the heat carried by the flue gas of the boiler. The heated air enters the combustion room again, which not only accelerates the drying, ignition and combustion processes of the fuel, ensures the stable combustion in the boiler, but also improves the average temperature level in the boiler, thereby strengthening the radiation heat transfer in the boiler and effectively improving the thermal efficiency of the boiler.
The production base of ZOZEN Boiler creates strict production procedure, each performs its own functions. The painting workers are responsible for the boiler painting, while the welding workers are cooperating with each other to do the welding work.
The manufacture of a high-quality industrial boiler requires many important links such as blanking, welding, assembly and inspection. In the busy production workshop of ZOZEN Boiler, the frontline workers of ZOZEN Boiler perform their duties and cooperate with each other.
As a member of ZOZEN Boiler, the after-sales personnel goes deep into the boiler room of customers to do debugging and maintenance. Sometimes, in order to satisfy the production needs of users, the after-sales team of ZOZEN Boiler carries out debugging work overnight, catching up with the progress and providing after-sales service wholeheartedly.
All employees of ZOZEN Boiler have established a good quality consciousness of zero defect and continuous improvement, and have practiced in the whole process of boiler design, technology, production, equipment and inspection.