The primary air fan of the boiler consists of motor, impeller, casing, air inlet box, current collector, base, regulating control system, etc.
The working process of the primary air fan: Take the medium-speed coal mill and direct-fired pulverizing system as examples, the atmosphere enters the primary air fan and is divided into two paths after being boosted by the primary air fan. One path of the atmosphere enters the primary airpipe in front of the coal mill. The other path enters the air preh...
1. Water leakage on the inner wall: Water leakage on the inner wall can be divided into three types: boiler leakage, water wall leakage and downcomer leakage. If the leakage holes of boiler barrel and water wall are relatively small, it is ok to use steel with the same steel grade for patching and flaw detection. If the downcomer is leaking, it needs to be replaced.
2. The hand hole leaks: you can re-install it from another angle to see if the hand hole cover is deformed. If it is deformed, you...
1. The defective parts in the last inspection.
2. Whether there are cracks and corrosion on the inner and outer surfaces of boiler pressure components, especially on openings, welds, edges and so on.
3. Whether the pipe wall is worn or corroded.
4. Whether there is any crack, fracture or corrosion at the brace of the boiler and the joint with the pulled element.
5. Whether the expansion port is tight, and whether there is annular crack in the expanded part of the pipe end.
6. Whether the ri...
Raw water: refers to water that has not been disinfected and filtered, such as river water, stream water, well water, reservoir water, etc.
Feed water: refers to the chemical water delivered from deaerator to boiler by feed pump.
Make-up water: Make-up water for boiler is to make up the lost part or externally supplied part after completing a steam-water cycle, so that the boiler can always operate at a safe water level.
Recycling condensing water: When the heat energy of steam or hot water i...
Water and electricity are not available;
Circulating water pump is not running;
Water flow switch is different;
The 200V 380V power supply is not connected;
The valve is not opened;
The controller switch is set incorrectly;
There is a problem with the controller circuit;
There is something wrong with the programmer;
Leak detection has not been checked;
Air pressure switch impassability;
Air pressure switch 1-3 impassability;
Overtemperature protection and combustion heat protection;...
(1) The furnace drying time depends on the shape, structure and humidity of the furnace. It takes 4 ~ 7 days for small low-pressure boilers and 10 ~ 15 days for heavy furnace walls.
(2) First, bake with wood, on the ash hopper of the room furnace and the grate of the chain furnace, use small fire for natural ventilation within 2 ~ 3 hours. When the temperature of combustion chamber rises, the ventilation capacity will be improved, and the flue damper can be turned down a little. It is best to k...
(1) The boiler and all auxiliary equipment are installed, and all tests such as ball passing test, hydrostatic test and air tightness test are qualified.
(2) All rotating devices, feed water pumps, condensate pumps, salt solution pumps, blowers and induced draft fans for coal conveying, combustion and ash removal are qualified for trial operation.
(3) The fuel and water supply are guaranteed, the steam, water and flue gas piping system are normal, and the connection unrelated to the boiler to ...
Before the boiler is put into operation, the furnace wall and arch must be baked and dried, which is called furnace drying. Furnace drying is to slowly dry the damp furnace wall and arch with warm fire to prevent ignition without furnace drying, causing cracking, deformation and serious damage.