What are the key contents of periodic inspection of boiler shutdown?

04 Feb 2022

1. The defective parts in the last inspection.

2. Whether there are cracks and corrosion on the inner and outer surfaces of boiler pressure components, especially on openings, welds, edges and so on.

3. Whether the pipe wall is worn or corroded.

4. Whether there is any crack, fracture or corrosion at the brace of the boiler and the joint with the pulled element.

5. Whether the expansion port is tight, and whether there is annular crack in the expanded part of the pipe end.

6. Whether the riveting seam is tight, with or without caustic embrittlement.

7. Whether the pressure components is dented, bending, bulging and overheating.

8. Whether there is corrosion at the contact between the pot and brick lining.

9. Whether the pressure components or boiler frame are overheated due to the damage of brick walls or fire walls.

10. Whether there is scale and slag on the water side of the pressure element, whether there is corrosion and crack at the interface between the water inlet pipe and the drain pipe and the drum, and whether the connection part between the drain valve and the drain pipe is firm.

11. Whether the safety accessories are sensitive and reliable, and whether the channels connected with the boiler body such as water meter, water meter column, safety valve and pressure gauge are blocked.

12. Whether the automatic control, signal system and instruments are sensitive and reliable.

Related news View More
  • Steam Runs Through the Brewing Process: ZOZEN Boiler Supports the Baijiu Industry
    Baijiu production is a continuous process. From grain steaming and fermentation to distillation, sterilization, and fermented-grain residue handling, many stages require a stable steam supply. As baijiu producers expand their operations, boiler systems need to provide sufficient steam while also adapting to different fuel conditions, changing loads, and environmental management requirements. In recent years, ZOZEN Boiler has developed steam boiler and auxiliary system solutions for baijiu produ...
    11 Aug 2026
  • A 10 TPH Boiler Delivered in 40 Days: The “ZOZEN Speed” Behind Yanjing Beer’s Letter of Appreciation
    Recently, Wuxi Zozen Boilers Co., Ltd. received a letter of appreciation from Yanjing Beer (Guilin Lijiang) Co., Ltd. In the letter, the customer expressed appreciation for ZOZEN Boiler’s responsiveness, coordination, and delivery support throughout the project. The customer also noted that ZOZEN helped resolve issues related to scheme adjustments, equipment access, and the delivery schedule. Letter of appreciation from Yanjing Beer (Guilin Lijiang) Co., Ltd. The letter was related to ...
    04 Aug 2026
  • ZOZEN Boiler Continues to Deepen 6S Management: From Workplace Standards to Manufacturing Coordination
    In industrial boiler manufacturing, the condition of materials, the organization of work areas, coordination between production processes, and safety requirements all affect the stability of manufacturing operations. As a boiler manufacturer, ZOZEN Boiler continues to promote 6S management by integrating Seiri, Seiton, Seiso, Seiketsu, Shitsuke, and Safety into daily workshop operations. The company is extending 6S management from workplace improvement to material control, process coordination, ...
    28 Jul 2026

Find the Right Boiler For You

Name *

Email *

WhatsApp/WeChat

Products

Power/Capacity