zozen boiler
Home Service FAQs Boiler basics What are the contents of boiler internal inspection?

What are the contents of boiler internal inspection?

24 Sep 2021

1. Prepare relevant technical data, including technical data of boiler manufacture and installation, boiler use registration data, boiler operation records, water quality test records, repair and modification records, accident records and previous inspection reports;

 

2. Stop the boiler in advance, drain the water in the boiler, and open all the door devices such as manhole, NDT hole, inspection hole and ash door on the boiler, so that the inside of the boiler can be fully cooled and ventilated;

 

3. Take reliable measures to cut off the steam, water supply and sewage pipes connected to the thermal system of the boiler under inspection and cut off the power supply. For oil-fired and gas-fired boilers, the oil and gas sources must be reliably cut off and ventilated;

 

4. Clean up dirt such as scale slag, slag and soot in the boiler;

 

5. Dismantle steam-water baffle, separating device, water supply device, sewage device and other drum internals that hinder inspection, and prepare safe power supply for lighting;

 

6. For the part that needs to be inspected at a high altitude (more than 3m above the ground), a foot stand shall be erected.

Related news View More
  • ZOZEN Boiler 2026 Sales Conference Successfully Held
    Spring brings new life and new beginnings. On February 25, 2026, the ninth day of the first lunar month—a date symbolizing longevity and good fortune—the "2026 ZOZEN Boiler Sales Conference & 2025 Annual Sales Awards Ceremony" was successfully held at the ZOZEN headquarters by Taihu Lake, Wuxi. The conference was themed "United We Start: Upholding Integrity with Innovation, Marching Towards Intelligence." General Manager Mr. Zhang Guoping, department heads, and the entire domest...
    25 Feb 2026
  • Guarding the Flavor of the "Red Industry": ZOZEN Gas Steam Boiler Solves Pain Points in Tomato Processing
    Every August to September, Xinjiang welcomes a grand feast of red harvest. As a globally significant production base for tomato paste, tomato products here are renowned for their high lycopene content. However, for tomato processing enterprises, this is not just a harvest season, but a race against time. The tomato maturity period is concentrated, and fresh fruit is difficult to store, leaving a processing window of only 45 to 55 days. Once equipment downtime occurs, mountains of fresh fruit wil...
    17 Feb 2026
  • Another Success in Indonesia: ZOZEN Boiler Boosts Production and Efficiency for Palm Oil Mill
    On the edge of the tropical jungles of Sumatra, Indonesia, the hum of machinery blends with the scent of palm fruit, painting a busy picture of the local palm oil processing industry. As a key global production base, Indonesian oil processing enterprises have a high dependency on reliable thermal energy supply. Booming Oil Processing Industry in Indonesia Recently, Wuxi ZOZEN Boiler Co., Ltd. ("ZOZEN Boiler") successfully delivered and commissioned a 15 t/h SZL series coal-fired steam boiler...
    03 Feb 2026

Find the Right Boiler For You

Name *

Email *

WhatsApp/WeChat

Products

Power/Capacity