What are the contents of boiler internal inspection?
1. Prepare relevant technical data, including technical data of boiler manufacture and installation, boiler use registration data, boiler operation records, water quality test records, repair and modification records, accident records and previous inspection reports;
2. Stop the boiler in advance, drain the water in the boiler, and open all the door devices such as manhole, NDT hole, inspection hole and ash door on the boiler, so that the inside of the boiler can be fully cooled and ventilated;
3. Take reliable measures to cut off the steam, water supply and sewage pipes connected to the thermal system of the boiler under inspection and cut off the power supply. For oil-fired and gas-fired boilers, the oil and gas sources must be reliably cut off and ventilated;
4. Clean up dirt such as scale slag, slag and soot in the boiler;
5. Dismantle steam-water baffle, separating device, water supply device, sewage device and other drum internals that hinder inspection, and prepare safe power supply for lighting;
6. For the part that needs to be inspected at a high altitude (more than 3m above the ground), a foot stand shall be erected.
-
SZS series gas-fired (oil-fired) steam boilerLive Chat2-110 t/h1.25-5.3 MPa
-
SHX coal-fired CFB (circulating fluidized bed) steam boilerLive Chat10-35 t/h1.25-2.5 MPa
-
DZL series biomass-fired steam boilerLive Chat2-10 t/h1-2.5 MPa
-
Email us
-
WhatsApp: +86 18861589035
WeChat: +86 13506150756
Live Chat

-
Industrial heating upgrades can have a direct impact on a factory’s production schedule and operational stability. For manufacturers investing in new facilities or upgrading equipment in Vietnam, boiler selection involves more than fuel costs. Process temperatures, continuous heat supply, emission requirements, and long-term maintenance must all be taken into account. Whether transitioning from coal to natural gas or biomass, manufacturers need a heating solution tailored to their actual p...17 Nov 2026 -
From spinning and weaving to dyeing, printing and heat setting, steam is required throughout multiple stages of textile production. As textile enterprises pay closer attention to energy costs, steam supply stability and emission requirements, boiler selection can no longer be based solely on rated evaporation capacity. Local fuel availability, production load, boiler room conditions and ongoing operation and maintenance also need to be considered. Recent textile projects served by ZOZEN Boiler ...10 Nov 2026 -
IntroductionIn Wuhan, Hubei Province, Hubei Hanjia New Materials Co., Ltd. and Wuhan Yiqingsheng Building Materials Co., Ltd. required thermal energy equipment for autoclave curing and continuous production-line heating, respectively. Based on the production processes, fuel conditions and site requirements of the two companies, ZOZEN Boiler supplied an 8 t/h DZL series biomass steam boiler and a 7.2-million-kcal YWW series biomass thermal oil boiler. The two projects use different heat-transfer ...03 Nov 2026