zozen boiler
Home Service FAQs Boiler basics How often should industrial boilers be inspected?

How often should industrial boilers be inspected?

17 Jul 2020

The industrial boiler’s external inspection usually is once a year and internal inspection is once every two years. In addition, a boiler should accept hydraulic test every six years. Those boilers that can not be inspected internally should accept hydraulic test every three years. Utility boiler’s internal inspection and hydraulic test cycle can be adjusted according to the overhaul cycle of power plant. The boiler can be put into operation only when its internal inspection, external inspection and hydraulic test are qualified within the validity period.

Related FAQs View More
Related news View More
  • ZOZEN Boiler to Exhibit at PALMEX JAKARTA 2026
    From May 6 to 7, 2026, ZOZEN Boiler will participate in Palmex Indonesia 2026 at Jakarta International Expo (JIEXPO), Indonesia. ZOZEN Boiler will welcome visitors at Booth 190 & 192. As an industry event focused on the palm oil sector in Southeast Asia, the exhibition brings together companies involved in palm oil processing, supporting energy systems, and industrial equipment, offering ZOZEN Boiler a valuable opportunity to meet customers from Indonesia and surrounding markets. ZOZEN Bo...
    28 Apr 2026
  • Bangladesh’s Textile Industry Continues to Grow, with Greater Focus on Fuel Adaptability and Operating Costs in Steam Boiler Configuration
    Bangladesh is one of the world’s major producers and exporters of garments and textiles. With a well-developed industrial chain covering textile, dyeing, printing, and garment manufacturing, long-term demand for industrial steam remains strong. In production processes such as dyeing, washing, drying, and finishing, steam boilers play an important role in ensuring stable heat supply. As local textile enterprises place greater emphasis on energy consumption control, fuel utilization, and ope...
    21 Apr 2026
  • ZOZEN Reciprocating Grate Biomass Steam Boilers Support Textile Projects in Pakistan
    In Pakistan, garment manufacturing and fabric processing remain important parts of industrial production. For these factories, steam is not an auxiliary utility but a core part of the production chain. Processes such as dyeing, drying, heat setting, and finishing all require a stable and continuous steam supply. Any fluctuation in steam output may affect production rhythm. Against this background, more textile companies in Pakistan are paying closer attention to fuel adaptability, operating sta...
    14 Apr 2026

Find the Right Boiler For You

Name *

Email *

WhatsApp/WeChat

Products

Power/Capacity