As a kind of special equipment, industrial boiler is special and complex. Complete inspection can ensure the safety operation of the boiler.

 

The external inspection of the boiler is generally conducted once a year, the internal inspection is generally conducted once every two years, and the hydrostatic test is generally conducted once every six years.

 

For boilers that cannot be inspected internally, a water pressure test should be conducted every three years. The internal inspection and hydrostatic test cycle of the boiler in the power plant can be appropriately adjusted according to the overhaul cycle of the power plant. Only when the internal inspection, external inspection and hydrostatic test are carried out within the qualified validity period can the boiler be put into operation.

Related news View More
  • From the Andes to São Paulo: How ZOZEN Boiler Is Expanding Its South American Industrial Footprint
    South America is rich in agricultural and energy resources and has a diverse manufacturing base. Industries such as papermaking, packaging and sugar processing are upgrading their production equipment as market and environmental requirements evolve. For these companies, a boiler is more than a steam source. Its performance affects production continuity, fuel consumption, process quality and emissions management. Through projects in Venezuela, Brazil and Ecuador, ZOZEN Boiler has continued to ex...
    21 Jul 2026
  • World Cup Spotlight on the Americas: How a Chinese Boiler Reached an Overseas Production Line
    As the 2026 FIFA World Cup brings the United States, Mexico and Canada into the international spotlight, attention is once again turning to the cities, industries and communities across North America. Away from the stadiums, manufacturing plants, beverage production lines and automotive component facilities continue their daily operations, providing steady support for local economies. ZOZEN Boiler’s WNS Series Serving Industrial Projects in North America In these less visible parts of ...
    14 Jul 2026
  • A Long-Run Story of an Old Boiler: ZOZEN WNS Series Gas-Fired Boiler Operating for 16 Years
    At the production site of a pharmaceutical company in Shanghai, a ZOZEN gas-fired steam boiler commissioned in 2010 has been operating steadily for 16 years. For this established pharmaceutical company, founded in 1995, the steam system is closely related to production rhythm, process coordination, and on-site operation support. Whether the equipment can maintain stable operation over the long term directly affects the continuity of daily production. Time is a practical test, and the continuous ...
    07 Jul 2026

Find the Right Boiler For You

Name *

Email *

WhatsApp/WeChat

Products

Power/Capacity