Raw water: refers to water that has not been disinfected and filtered, such as river water, stream water, well water, reservoir water, etc.
Feed water: refers to the chemical water delivered from deaerator to boiler by feed pump.
Make-up water: Make-up water for boiler is to make up the lost part or externally supplied part after completing a steam-water cycle, so that the boiler can always operate at a safe water level.
Recycling condensing water: When the heat energy of steam or hot water i...
Water and electricity are not available;
Circulating water pump is not running;
Water flow switch is different;
The 200V 380V power supply is not connected;
The valve is not opened;
The controller switch is set incorrectly;
There is a problem with the controller circuit;
There is something wrong with the programmer;
Leak detection has not been checked;
Air pressure switch impassability;
Air pressure switch 1-3 impassability;
Overtemperature protection and combustion heat protection;...
The boiler drum is connected with downcomer and water wall to form a natural circulation loop. At the same time, the boiler drum receives the feed water from the economizer and delivers saturated steam to the superheater. Therefore, the boiler drum is the connecting hub of the three processes of heating, evaporation and overheating in the boiler.
When choosing the 80-ton gas-fired steam boiler, the price determines the customer's upfront investment cost, so it is as important as the quality. However, the price is not determined by a single factor, it is related to many aspects, the price of 80-ton gas-fired steam boiler will be different with different choices. Let’s talk about what are the main factors that affect the 80-ton gas-fired steam boiler?
(1) The mortar in the outer brick joints of the furnace wall can be ground into powder by hand without bonding, which indicates the mortar has been dried.
(2) Use a thermometer to insert 100mm from the outer wall. When the temperature reaches 50℃, it can last for 48h, and the outer wall temperature should be uniform.
(1) The furnace drying time depends on the shape, structure and humidity of the furnace. It takes 4 ~ 7 days for small low-pressure boilers and 10 ~ 15 days for heavy furnace walls.
(2) First, bake with wood, on the ash hopper of the room furnace and the grate of the chain furnace, use small fire for natural ventilation within 2 ~ 3 hours. When the temperature of combustion chamber rises, the ventilation capacity will be improved, and the flue damper can be turned down a little. It is best to k...
(1) The boiler and all auxiliary equipment are installed, and all tests such as ball passing test, hydrostatic test and air tightness test are qualified.
(2) All rotating devices, feed water pumps, condensate pumps, salt solution pumps, blowers and induced draft fans for coal conveying, combustion and ash removal are qualified for trial operation.
(3) The fuel and water supply are guaranteed, the steam, water and flue gas piping system are normal, and the connection unrelated to the boiler to ...
Before the boiler is put into operation, the furnace wall and arch must be baked and dried, which is called furnace drying. Furnace drying is to slowly dry the damp furnace wall and arch with warm fire to prevent ignition without furnace drying, causing cracking, deformation and serious damage.