Xincheng Hotel is the first five-star hotel in Inner Mongolia Autonomous Region that integrates catering, accommodation, entertainment, and conferences. It has rooms, restaurants, bars, conference venues, theater shopping stores and National Travel Agency. Since its establishment, it has always been tasked with receiving party and state leaders, foreign heads of state, and important guests from all walks of life. In such large and important places, heating and sanitation water must be backed by boilers with excellent quality and safety in winter. After the bidding activities, Xincheng Hotel cooperated with ZOZEN boiler, and ZOZEN provided two 6-ton WNS condensing gas-fired boilers. The thread smoke pipes of this series of boilers are high-efficiency heat transfer elements that ZOZEN boiler has been researching for many years. When satisfying the minimum flow resistance, the heat transfer coefficient is 1.2 times higher than that of ordinary tobacco pipes when the thread groove depth
Jiangsu SINOPEC mainly produces power cables, fire-retardant cables for coal mines, and various flame-retardant and fire-resistant special wires and cables. Wires and cables project production process requires a lot of steam, in which the extruder heating, mixing rubber equipment preheating process in the drive 1 ~ 2h need to use 0.3 ~ 0.4MPa low pressure steam preheating, cable continuous cross-linking process requires a pressure of 2.5MPa Steam as a heating medium. In recent years, through years of sustained and stable development, the company’s scale and overall strength have been continuously improved. In 2016, Jiangsu SINOPC replaced coal-fired boilers with gas-fired boilers. ZOZEN and Jiangsu SINOPEC are both in the beautiful coast of Taihu Lake. As we all know, ZOZEN boiler has advanced manufacturing technology and complete equipment, the service life of the boiler is very long. After the inspection at ZOZEN boiler, Jiangsu SINOPEC ordered two 6-ton SZS condensing gas-fired boil
PT.Lontar Papyrus has built their pulp mill in Sumatra island since 1994.
During manufacture, the raw material needs to be cut, grinded and cooked, as per the capacity rising, the huge power and steam consumption makes the manufacturing cost higher and higher. For making their product more competitive, PT.Lontar Papyrus decided to build their own cogeneration energy plant, high-quality steam is used for making electricity and low-quality steam is used for process. Cogeneration boiler has high requirement for steam quality, pressure, and boiler smooth running. Because it needs to be installed on-site, it also requires the supplier to be profession for on-site installation. After many times visit and discuss, PT.Lontar Papyrus chose ZOZEN coal-fired steam boiler, by cooperating with local agent, ZOZEN full filled this big project successfully. The boiler has been running well and each target are reached too.
Jinxinnong signed an investment cooperation agreement with the government of Jiujiang District of Wuhu City to build an annual output of 500,000tons of green and pollution-free pig feed in Wuhu, Anhui Province. The produce of feed for this project requires heating of the steam generated by the boiler. Jin Xinnong, through recommendations of the industry, ordered a 4-ton WNS condensing gas-fired boiler at ZOZEN. The technicians of ZOZEN boiler proposed a new WNS series boiler with additional condensers at the end of the feed heating process accompanied by a large amount of waste heat. The waste heat from the flue gas at the end of the boiler can be used to increase the boiler inlet temperature, reduce the temperature of the exhaust gas and increase the thermal efficiency of the boiler, save operating costs for the company. After the completion of the project, Anhui Jinxin Agricultural Construction Co., Ltd. has 20t/h high-grade piglet material production 2 lines, 50t/h pig compound feed
Pharmaceutical production companies are inseparable from steam boilers, and Jiahe Pharmaceuticals is a modern pharmaceutical company integrating pharmaceutical production, sales, and research and development. In recent years, R&D investment in technology innovation has been continuously increased. In terms of boiler room renovation, Jiahe Pharmaceutical has learned that ZOZEN boiler is the first business in China to use an arched tube plate and a threaded tobacco pipe structure to increase honduction and completely solve the problem of cracking of the rear tube plate. From the aspect of making boilers, Jiahe Pharmaceuticals has decisively selected the "Zozen Brand" 4-ton biomass-fired steam boiler (DZL4-1.25-T). The boiler is a horizontal three-pass water-fire pipe chain grate boiler with compact structure and simple size. After the completion of the transformation, it is expected that Jiahe pharmaceutical company will achieve leapfrog development in the next few years.ZOZEN
Hebei Ruixin Jinhua New Energy Technology Co., Ltd. invested RMB 320 million in 2015 to build a 100,000-ton/year crude benzene hydrotreating project in two phases; in 2016, it invested RMB 120 million in equipment and manufacturing in District A of Fengfeng Mining Area. "Triazole, piperidone production project." In the early stage of the project, the technical personnel of ZOZEN boiler went to the customer site for field visits to help the customer analyze the equipment occupation area and site space planning. What’s more, the need of steam in the process must be high-temperature and stable. In the end, ZOZEN boiler design a thermal oil heater with a rated thermal power of 20 million kcal to the project for the customer. The boiler adopts ejected forced circulation system, it has a complete control system and safety monitoring device that can accurately control the working temperature and safeguard safety operation.