When determining how much space should be between steam boilers, serviceability should be at the top of your mind. Sure, you want to save space, but you also want to make sure you have plenty of elbow room to service your boiler properly.
One of the most crucial factors that will determine how you space your boiler units is whether your boiler system is being installed in a new construction facility or an existing building that is being retrofitted.
While a new construction gives you a lot of control over how much space you need to accommodate your boilers, a retrofit project requires you to work around what you have been given. If you’re dealing with a newly constructed facility, boilers can actually be installed before being closed in later by a wall or ceiling. Retrofitting an existing facility for a new boiler does not have this luxury, which is why large boiler installation may require opening existing walls and ceilings, maneuvering the boiler system into place, and then closing the boiler room back up. For some retrofits, you may even need to expand an existing room if your new boiler system is larger than your previous one or if you foresee needing to add another unit to your modular boiler system later down the road.
Of course, depending on the boiler you choose, making renovations to accommodate a retrofit may not even be necessary.
Whether you need to install boilers in a newly constructed facility or in an existing facility that requires a retrofit, choosing a modular water tube boiler system will ensure that you have plenty of room to meet your current steam needs, as well as plan for the future.
-
SZL series biomass-fired steam boilerLive Chat6-35 t/h1-2.5 MPa
-
WNS series gas-fired (oil-fired) steam boilerLive Chat1-20 t/h0.7-2 MPa
-
SHX coal-fired CFB (circulating fluidized bed) steam boilerLive Chat10-35 t/h1.25-2.5 MPa
-
Email us
-
WhatsApp: +86 18861589035
WeChat: +86 13506150756
Live Chat

-
Industrial heating upgrades can have a direct impact on a factory’s production schedule and operational stability. For manufacturers investing in new facilities or upgrading equipment in Vietnam, boiler selection involves more than fuel costs. Process temperatures, continuous heat supply, emission requirements, and long-term maintenance must all be taken into account. Whether transitioning from coal to natural gas or biomass, manufacturers need a heating solution tailored to their actual p...17 Nov 2026 -
From spinning and weaving to dyeing, printing and heat setting, steam is required throughout multiple stages of textile production. As textile enterprises pay closer attention to energy costs, steam supply stability and emission requirements, boiler selection can no longer be based solely on rated evaporation capacity. Local fuel availability, production load, boiler room conditions and ongoing operation and maintenance also need to be considered. Recent textile projects served by ZOZEN Boiler ...10 Nov 2026 -
IntroductionIn Wuhan, Hubei Province, Hubei Hanjia New Materials Co., Ltd. and Wuhan Yiqingsheng Building Materials Co., Ltd. required thermal energy equipment for autoclave curing and continuous production-line heating, respectively. Based on the production processes, fuel conditions and site requirements of the two companies, ZOZEN Boiler supplied an 8 t/h DZL series biomass steam boiler and a 7.2-million-kcal YWW series biomass thermal oil boiler. The two projects use different heat-transfer ...03 Nov 2026