What are the correct ignition procedures for industrial coal-fired boilers?
The ignition of industrial coal-fired boiler needs to be operated steps by steps, and the ignition operation is different according to the specific model of industrial coal-fired boiler. Grates of industrial coal-fired boilers are usually divided into manual grates and mechanical grates. Here, according to the different grates, the correct ignition steps of industrial coal-fired boilers are introduced in detail.
Ignition steps of manual grate industrial coal-fired boiler:
The materials required for ignition include combustible materials (for ignition), firewood (for transition) and coal.
- First of all, combustible materials and firewood are stacked on the grate and laid flat in front of the grate to ignite combustible materials and firewood.
- Then wait for the firewood to burn and throw a small amount of coal on the fire by manual or mechanical means (first use small particles of coal).
- After the coal burns, gradually move the fire around the grate, and then spread the coal over the entire grate. The entire ignition process is finished.
Ignition steps of mechanical grate industrial coal-fired boiler:
The ignition area of the grate is located between the rear arch of the arched bucket and the coal gate. Combustibles, firewood and coal are laid in layers in the ignition area, with coal at the bottom and combustible and firewood at the top.
- Ensure that the negative pressure in the hearth of the coal-fired boiler is between 15pa and 30pa, turn on the induced draft fan of the boiler, and start ignition.
- Ignite the upper fuel, wait for the upper fuel to burn stably, and then slowly rotate the grate to advance about 0.8 meters.
- Wait for the bottom coal to burn. When the coal is burning, open the east grate and start the boiler blower to increase the coal transportation. According to the combustion condition of coal, open the baffles of each part of air chamber.
-
SZL series coal-fired steam boilerLive Chat6-35 t/h1-2.5 MPa
-
SHX coal-fired CFB (circulating fluidized bed) steam boilerLive Chat10-35 t/h1.25-2.5 MPa
-
DHL series coal-fired steam boilerLive Chat20-75 t/h1.25-5.4 MPa
-
Email us
-
WhatsApp: +86 18861589035
WeChat: +86 13506150756
Live Chat

-
Industrial heating upgrades can have a direct impact on a factory’s production schedule and operational stability. For manufacturers investing in new facilities or upgrading equipment in Vietnam, boiler selection involves more than fuel costs. Process temperatures, continuous heat supply, emission requirements, and long-term maintenance must all be taken into account. Whether transitioning from coal to natural gas or biomass, manufacturers need a heating solution tailored to their actual p...17 Nov 2026 -
From spinning and weaving to dyeing, printing and heat setting, steam is required throughout multiple stages of textile production. As textile enterprises pay closer attention to energy costs, steam supply stability and emission requirements, boiler selection can no longer be based solely on rated evaporation capacity. Local fuel availability, production load, boiler room conditions and ongoing operation and maintenance also need to be considered. Recent textile projects served by ZOZEN Boiler ...10 Nov 2026 -
IntroductionIn Wuhan, Hubei Province, Hubei Hanjia New Materials Co., Ltd. and Wuhan Yiqingsheng Building Materials Co., Ltd. required thermal energy equipment for autoclave curing and continuous production-line heating, respectively. Based on the production processes, fuel conditions and site requirements of the two companies, ZOZEN Boiler supplied an 8 t/h DZL series biomass steam boiler and a 7.2-million-kcal YWW series biomass thermal oil boiler. The two projects use different heat-transfer ...03 Nov 2026