What are the correct ignition procedures for industrial coal-fired boilers?
The ignition of industrial coal-fired boiler needs to be operated steps by steps, and the ignition operation is different according to the specific model of industrial coal-fired boiler. Grates of industrial coal-fired boilers are usually divided into manual grates and mechanical grates. Here, according to the different grates, the correct ignition steps of industrial coal-fired boilers are introduced in detail.
Ignition steps of manual grate industrial coal-fired boiler:
The materials required for ignition include combustible materials (for ignition), firewood (for transition) and coal.
- First of all, combustible materials and firewood are stacked on the grate and laid flat in front of the grate to ignite combustible materials and firewood.
- Then wait for the firewood to burn and throw a small amount of coal on the fire by manual or mechanical means (first use small particles of coal).
- After the coal burns, gradually move the fire around the grate, and then spread the coal over the entire grate. The entire ignition process is finished.
Ignition steps of mechanical grate industrial coal-fired boiler:
The ignition area of the grate is located between the rear arch of the arched bucket and the coal gate. Combustibles, firewood and coal are laid in layers in the ignition area, with coal at the bottom and combustible and firewood at the top.
- Ensure that the negative pressure in the hearth of the coal-fired boiler is between 15pa and 30pa, turn on the induced draft fan of the boiler, and start ignition.
- Ignite the upper fuel, wait for the upper fuel to burn stably, and then slowly rotate the grate to advance about 0.8 meters.
- Wait for the bottom coal to burn. When the coal is burning, open the east grate and start the boiler blower to increase the coal transportation. According to the combustion condition of coal, open the baffles of each part of air chamber.
-
SZL series coal-fired steam boilerLive Chat6-35 t/h1-2.5 MPa
-
SHX coal-fired CFB (circulating fluidized bed) steam boilerLive Chat10-35 t/h1.25-2.5 MPa
-
DHL series coal-fired steam boilerLive Chat20-75 t/h1.25-5.4 MPa
-
Email us
-
WhatsApp: +86 18861589035
WeChat: +86 13506150756
Live Chat

-
From September 17 to 21, 2026, the 23rd China-ASEAN Expo will be held at the Nanning International Convention and Exhibition Center in Guangxi, China. Enterprises from China and the 11 ASEAN member states will gather in Nanning to present products and exchange views on trade and economic cooperation, artificial intelligence applications, smart equipment, green energy and other fields. With the theme “Share 3.0 Opportunities, Create a Better Life,” this year’s China-ASEAN Expo ...15 Sep 2026 -
Behind industrial manufacturing often lies an invisible thermal energy lifeline. Whether boiling syrup, synthesizing chemical materials, or pressing new energy security materials, every physical and chemical change on the production line has strict requirements for the temperature, pressure, and continuity of thermal energy. When green biomass energy enters these vastly different manufacturing workshops, how can various forms of pellets, wood blocks, or straw be converted into the "precise temp...08 Sep 2026 -
Recently, a special equipment inspection team visited Wuxi Zozen Boilers Co., Ltd. for an inspection and guidance session. Mr. Zhang Guoping, General Manager of ZOZEN Boiler, together with representatives from relevant departments, participated in the inspection and discussions. The meeting focused on special equipment production quality management, the implementation of safety responsibilities, manufacturing process control, and documentation management. Special Equipment Inspection Team Con...25 Aug 2026