Home Service FAQs FAQ of coal-fired boilers What are the quick ignition steps of the boiler?

What are the quick ignition steps of the boiler?

20 May 2022

Boiler ignition refers to the process of opening the ignition fuel valve through the igniter and ignition fuel after the boiler ignition preparation is completed, then turning on the ignition switch, and turning off the ignition system after the combustion flame is stable and normal.

 

The purpose of boiler ignition: to pressurize and raise the temperature inside the boiler, so that the fuel of the boiler can enter the furnace chamber for stable ignition and combustion.

 

The ignition steps of the hot water boiler:

  1. The hot water boiler should be comprehensively inspected before ignition, and the accessory pipes should also be inspected. Close the drain valve and open the pressure gauge cock to allow the air in the hot water boiler to be discharged.
  2. Slowly inject the treated water into the hot water boiler, and the inlet water temperature is generally not higher than 40℃. When the water level reaches the lowest position of the water level gauge, close the water supply valve. After the water level is stable, observe whether the water level is lowered, and then supplement it to the normal water level.
  3. When the hot water boiler is ignited, open the ignition door, place firewood and other igniters (nails are forbidden to bring in) at the front end of the grate for ignition, open the large flue gas damper to enhance the natural ventilation. After the ignitor burns, turn down the flue gas damper, and turn on the induced draft fan intermittently. After the ignitor burns vigorously, start manual coal filling, observe the fire situation at the fire observation hole, and stir the fire appropriately. After the coal can catch fire continuously, adjust the drum and induced air volume, and maintain the negative pressure of the furnace.
Related FAQs View More
Related news View More
  • 'Old Friend, New Collaboration' — ZOZEN Steam Boilers Empower Sentury Tire's Morocco Factory
    Following the successful operation and intelligent upgrade of its Thailand factory, Sentury Tire has taken another strategic leap forward. The first batch of tires has officially rolled off the production line at its new Morocco factory, marking a significant milestone in the company's "Go Global 2.0" strategy. As a long-term partner of Sentury Tire, ZOZEN Boiler once again provided strong support with two sets of gas-fired steam boilers, helping the company take a solid step in its global produ...
    17 Dec 2024
  • ZOZEN Energy-saving and Environmental Steam Boilers in Textile Industrial Park
    Anyang, a city known as the "Yubei Textile City," boasts a long history in the textile industry and is an important base for knitting, weaving, and printing and dyeing in Henan Province. In the Beiguan District of Anyang City, the printing and dyeing demonstration park is injecting new vitality into the green development of the textile printing and dyeing industry with an innovative circular economy model that integrates six major functions. As a leader in the industrial boiler industry, ZOZEN&n...
    10 Dec 2024
  • ZOZEN 40-Ton Biomass Steam Boiler Supports General Rubber Project in Thailand
    Under the backdrop of global economic integration, an increasing number of companies are choosing to establish factories overseas. Thailand, as an important base for the global rubber industry, has become a destination for the overseas expansion of many enterprises. The General Rubber Thailand factory, which is the overseas production base of General Shares, was invested in and built in the first phase in 2019 and officially put into operation in January 2020, laying a solid foundation for the d...
    03 Dec 2024

Find the Right Boiler For You

Name *

Email *

WhatsApp/WeChat

Products

Power/Capacity